![Krick COMTESSE Building Instruction Download Page 37](http://html.mh-extra.com/html/krick/comtesse/comtesse_building-instruction_2003808037.webp)
Status September 2018
Page 5
©
Krick Modelltechnik, Knittlingen, Germany
Fig. main bulkhead glued
Now the bulkhead can be fitted into the hull.
Push the bulkhead into the hull until it is verti-
cally under the hole for the mast foot. To
check, insert the mast foot through the hole.
Fig. reinforcement boards
Now push the reinforcement plates for the
shroud fastening into the slots in the frame and
check the position by screwing in the eyebolts,
part 1.14.
If everything fits, fix the frame with super glue
in some places. Then glue the frame with Sta-
bilit Express. Make sure that no glue gets into
the side trays for the reinforcement boards of
the walls.
Fig. frame glued in
In the next step glue in the two reinforcement
boards for the shrouds.
Fig. reinforcement boards
Fit the rear hull reinforcement 1.15 and glue
with Stabilit Express.
Fig. rear hull reinforcement
To press on the hull reinforcement, wooden
strips can extend the clamps.
1.14
1.15
reinforcement board
reinforcement board
Summary of Contents for COMTESSE
Page 29: ...Stand September 2018 Seite 29 Krick Modelltechnik Knittlingen Bild 2 Ruder ...
Page 30: ...Stand September 2018 Seite 30 Krick Modelltechnik Knittlingen Abb 5 Mast ...
Page 31: ...Stand September 2018 Seite 31 Krick Modelltechnik Knittlingen ...
Page 32: ...Stand September 2018 Seite 32 Krick Modelltechnik Knittlingen ...
Page 61: ...Status September 2018 Page 29 Krick Modelltechnik Knittlingen Germany Fig 2 Rudder ...
Page 62: ...Status September 2018 Page 30 Krick Modelltechnik Knittlingen Germany Fig 5 Mast ...
Page 63: ...Status September 2018 Page 31 Krick Modelltechnik Knittlingen Germany Fig 6 Booms ...
Page 64: ...Status September 2018 Page 32 Krick Modelltechnik Knittlingen Germany ...
Page 94: ...Version Septembre 2018 Page 30 Krick Modelltechnik Knittlingen Vue 2 Gouvernail ...
Page 95: ...Version Septembre 2018 Page 31 Krick Modelltechnik Knittlingen Vue 5 Mât ...
Page 96: ...Version Septembre 2018 Page 32 Krick Modelltechnik Knittlingen ...
Page 97: ...Version Septembre 2018 Page 33 Krick Modelltechnik Knittlingen ...