![Krick COMTESSE Building Instruction Download Page 36](http://html.mh-extra.com/html/krick/comtesse/comtesse_building-instruction_2003808036.webp)
Status September 2018
Page 4
©
Krick Modelltechnik, Knittlingen, Germany
Fig. front reinforcement board
After gluing parts 1.2 and 1.3, insert the hexa-
gon nut M3 and glue part 1.4 to the end. Make
sure that no adhesive gets into the thread.
Fig. front reinforcement board with nut M 3 and
eyebolt M 3
Coat the upper side of board 1.2 with Stabilit-
Express. Insert the board with the handle into
the hull and screw the eye bolt 1.6 through the
deck from above to secure and tighten. Clamp
the handle to the edge of the sliding hatch until
the adhesive has cured. Make sure that no
glue gets to the screw thread, otherwise the
eyebolt is stuck and cannot be loosened any
more. After the adhesive has dried, break off
the handle at the predetermined breaking
points.
Fig. reinforcing board in position
Now also make the lateral reinforcement
boards for the shroud fastening in the same
way from parts 1.10 to 1.12.
Fig. lateral reinforcement boards
Now the main bulkhead can be made with the
mast mounting from parts 1.7 to 1.9.
Fig. parts main bulkhead
First glue part 1.8 to part 1.7 at the marked
point. Then glue both parts 1.9 from the front
and rear over the cutout.
Now paint the frame and the reinforcement
boards several times with pore filler.
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
Summary of Contents for COMTESSE
Page 29: ...Stand September 2018 Seite 29 Krick Modelltechnik Knittlingen Bild 2 Ruder ...
Page 30: ...Stand September 2018 Seite 30 Krick Modelltechnik Knittlingen Abb 5 Mast ...
Page 31: ...Stand September 2018 Seite 31 Krick Modelltechnik Knittlingen ...
Page 32: ...Stand September 2018 Seite 32 Krick Modelltechnik Knittlingen ...
Page 61: ...Status September 2018 Page 29 Krick Modelltechnik Knittlingen Germany Fig 2 Rudder ...
Page 62: ...Status September 2018 Page 30 Krick Modelltechnik Knittlingen Germany Fig 5 Mast ...
Page 63: ...Status September 2018 Page 31 Krick Modelltechnik Knittlingen Germany Fig 6 Booms ...
Page 64: ...Status September 2018 Page 32 Krick Modelltechnik Knittlingen Germany ...
Page 94: ...Version Septembre 2018 Page 30 Krick Modelltechnik Knittlingen Vue 2 Gouvernail ...
Page 95: ...Version Septembre 2018 Page 31 Krick Modelltechnik Knittlingen Vue 5 Mât ...
Page 96: ...Version Septembre 2018 Page 32 Krick Modelltechnik Knittlingen ...
Page 97: ...Version Septembre 2018 Page 33 Krick Modelltechnik Knittlingen ...