![Krick COMTESSE Building Instruction Download Page 35](http://html.mh-extra.com/html/krick/comtesse/comtesse_building-instruction_2003808035.webp)
Status September 2018
Page 3
©
Krick Modelltechnik, Knittlingen, Germany
The construction of the model
Stage 0, the boat stand, parts 0.1 - 0.3
Fig. individual parts of the stand
Glue the boat stand together from parts 0.1 to
0.3. Grind all edges with sandpaper so that the
burn-off residue is removed from the laser
cutting.
Fig. stand glued together
Stage 1, preparations for hull, parts 1.1 to
1.9
Grind off the surrounding seam on the hull.
Cut out the dome at the rear. Mark the opening
for the sliding hatch as seen from above and
cut it out by scribing several times.
Dome and sliding hatch are shown in drawing
1 A with grid pattern.
Fig. hull processing
The following holes must be drilled in the hull:
3 mm for eye bolts 1.6 and 1.14 for jib suspen-
sion and shrouds.
5 mm for the rudder bearing
6 mm for the mast bearing
Optional: 6 mm for the sterntube if the drive set
is to be installed. See also section X Installa-
tion of the propulsion unit.
Fig. holes in deck
Fig. holes on underside of hull
Drill the holes exactly according to drawings
1A and 1B.
When drilling the holes, drill very accurately to
avoid large gaps, especially with the rudder
bearing D 5 mm. The tube should fit very
tightly so that it can be easily aligned and re-
mains in position until the adhesive has hard-
ened.
Optional:
If the propulsion set is to be installed, drill the
hole for the stern tube D 6 mm at a distance of
125 mm from the rudder tube.
Make the front reinforcement and attachment
for the jib mount from parts 1.2 to 1.5.
Prime all wooden parts with pore filler before
gluing them into the hull.
0.3
0.3
0.1
0.2
Hull Seam
Dome
Opening for
Sliding Hatch
125 mm
Summary of Contents for COMTESSE
Page 29: ...Stand September 2018 Seite 29 Krick Modelltechnik Knittlingen Bild 2 Ruder ...
Page 30: ...Stand September 2018 Seite 30 Krick Modelltechnik Knittlingen Abb 5 Mast ...
Page 31: ...Stand September 2018 Seite 31 Krick Modelltechnik Knittlingen ...
Page 32: ...Stand September 2018 Seite 32 Krick Modelltechnik Knittlingen ...
Page 61: ...Status September 2018 Page 29 Krick Modelltechnik Knittlingen Germany Fig 2 Rudder ...
Page 62: ...Status September 2018 Page 30 Krick Modelltechnik Knittlingen Germany Fig 5 Mast ...
Page 63: ...Status September 2018 Page 31 Krick Modelltechnik Knittlingen Germany Fig 6 Booms ...
Page 64: ...Status September 2018 Page 32 Krick Modelltechnik Knittlingen Germany ...
Page 94: ...Version Septembre 2018 Page 30 Krick Modelltechnik Knittlingen Vue 2 Gouvernail ...
Page 95: ...Version Septembre 2018 Page 31 Krick Modelltechnik Knittlingen Vue 5 Mât ...
Page 96: ...Version Septembre 2018 Page 32 Krick Modelltechnik Knittlingen ...
Page 97: ...Version Septembre 2018 Page 33 Krick Modelltechnik Knittlingen ...