18
9.4
Control Board Removal and Installation
Heat shield
Burner Assembly
Nuts securing burner assembly
1. Turn the fireplace off.
2. Remove safety barrier.
3. Locate the manual valve installed by your qualified service
technician.
4. Turn the manual valve clockwise to the OFF position.
5. Disconnect any wall switch, remote control, or thermostat
from the top and bottom terminals on the gas valve, OR
unplug all components from receptacle and disconnect all
wiring harnesses attached to the gas valve.
6. Disconnect the gas line flex tube from manual shut off
valve.
7. Remove the glass frame assembly and log set.
8. Removed the burner assembly. (Secured with [2] nuts)
9. Remove the top burner heat shield.
10. Remove secondary burner heat shield resting on the
control board.
11. Remove (6) nuts securing the control board. Remove the
control board.
1. Place the control board in firebox, aligning the holes in
board with mounting studs at the bottom of the firebox.
VERIFY SEALING GASKET IS IN PLACE ON THE
BOTTOM OF THE FIREBOX.
2. Secure the control board with screws previously removed.
3. Reinstall secondary burner heat shield by placing it on top
of the control board.
4. Reinstall burner heat shield. Position the cut-out over pilot
assembly and burner orifice, centering from side-to-side
and as far back as possible.
5. Reinstall log set.
6. Reconnect the gas line flex tube to the manual shut-off
valve.
7. Reconnect any wall switch, remote control, or thermostat
wires to the top and bottom terminals on the gas valve,
OR reconnect all wiring harnesses to the gas valve. Plug
all components into an electrical outlet.
8. Reinstall the glass frame assembly and safety barrier.
9. Turn the manual valve counterclockwise to the ON
position.
10. Verify proper log placement, fireplace operation, and any
electrical components.
9.4.1
Control Board Removal
CAUTION
If burner and/or pilot have been burning, use appropriate protection to avoid burns or damage to personal property before removing any
components.
Check all connections for leaks with soapy water, whether field or factory made.
9.4.2
Control Board Installation
Figure 9.8, Control Board Removal and Installation
(6) Nuts securing control board