TABLE OF CONTENTS
14
MAXIMUM IMMERSION DEPTH ............................................................................
LOADING HEAPED AND LEVEL MATERIAL ........................................................
LOADING OPERATIONS ON SLOPES ..................................................................
3.13.1 POSITIONING THE BUCKET ACCORDING TO THE WORK THAT MUST
3.13.2 POSITIONING THE MACHINE FOR DIGGING OPERATIONS...............................................
CHANGING THE BACKHOE BUCKET...................................................................
3.14.1 PREPARING THE MACHINE FOR A LONG PERIOD OF INACTIVITY ..................................
3.14.2 PREPARING THE ENGINE FOR A LONG PERIOD OF INACTIVITY .....................................
STARTING WITH BOOSTER CABLES ..................................................................
https://tractormanualz.com
Summary of Contents for WB93R-5
Page 2: ...https tractormanualz com...
Page 21: ...SAFETY AND ACCIDENT PREVENTION 19 https tractormanualz com...
Page 64: ...62 THIS PAGE WAS INTENTIONALLY LEFT EMPTY https tractormanualz com...
Page 65: ...THE MACHINE AND ITS OPERATIONS 63 https tractormanualz com...
Page 166: ...164 THIS PAGE WAS INTENTIONALLY LEFT EMPTY https tractormanualz com...
Page 167: ...MAINTENANCE 165 https tractormanualz com...
Page 235: ...TECHNICAL SPECIFICATIONS 233 https tractormanualz com...
Page 241: ...TECHNICAL DATA 239 5 1 3 3 LIFTING CAPACITIES TELESCOPIC ARM https tractormanualz com...
Page 242: ...240 THIS PAGE WAS INTENTIONALLY LEFT EMPTY https tractormanualz com...
Page 243: ...AUTHORISED OPTIONAL EQUIPMENT 241 https tractormanualz com...
Page 283: ...https tractormanualz com...