CONFIGURATION FOR THE INSTALLATION OF THE DEMOLITION HAMMER
264
3 - Remove the plugs of the machine pipes and of the ham-
mer flexible pipes.
Use 32, 36, 38 and 41 mm hex wrenches.
4 - Connect the right pipe to the coupling (1) and the left pipe
to the coupling (2), making sure that the sizes of the pipe
fittings are as required.
CAUTION
q
When connecting the pipes, take care to prevent any im-
purities from getting into them.
5 - Start the machine and raise the demolition hammer posi-
tioning it vertically.
6 - Stop the machine again and lubricate the joints (see
"4.5.1 LUBRICATION DIAGRAM") and the hammer (see
the specific operation and maintenance manual).
7 - Before starting work, check the tightness of the circuit.
WARNING
q
Wear thick gloves and safety goggles during this check.
q
To check the system for leaks, use a piece of cardboard
or a wooden board.
1"7/16-12
ORFS
1
RWA29290
TELESCOPIC
ARM
1"3/16-12
ORFS
2
RWA29300
STANDARD
ARM
1"7/16-12
ORFS
1
RWA29280
STANDARD
ARM
1"3/16-12
ORFS
2
RWA29310
TELESCOPIC
ARM
https://tractormanualz.com
Summary of Contents for WB93R-5
Page 2: ...https tractormanualz com...
Page 21: ...SAFETY AND ACCIDENT PREVENTION 19 https tractormanualz com...
Page 64: ...62 THIS PAGE WAS INTENTIONALLY LEFT EMPTY https tractormanualz com...
Page 65: ...THE MACHINE AND ITS OPERATIONS 63 https tractormanualz com...
Page 166: ...164 THIS PAGE WAS INTENTIONALLY LEFT EMPTY https tractormanualz com...
Page 167: ...MAINTENANCE 165 https tractormanualz com...
Page 235: ...TECHNICAL SPECIFICATIONS 233 https tractormanualz com...
Page 241: ...TECHNICAL DATA 239 5 1 3 3 LIFTING CAPACITIES TELESCOPIC ARM https tractormanualz com...
Page 242: ...240 THIS PAGE WAS INTENTIONALLY LEFT EMPTY https tractormanualz com...
Page 243: ...AUTHORISED OPTIONAL EQUIPMENT 241 https tractormanualz com...
Page 283: ...https tractormanualz com...