2-33
12. OPERATION
12. OPERATION
3.
Operate work equipment control lever
3
slowly to move the
bucket cylinder and lift cylinder to the end of their stroke.
4.
Operate the bucket and lift arm for 30 seconds each in turn.
5.
After carrying out the warming-up operation, check that the
gauges and pilot lamps are normal.
If any abnormality is found, carry out repairs.
Operate the machine under light load until engine water tem-
perature gauge
4
and HST oil temperature gauge
5
are in the
white range.
6.
Check that there is no abnormal exhaust gas color, noise, or
vibration.
If any abnormality is found, carry out repairs.
Summary of Contents for WA20-2
Page 39: ...1 30 MEMO ...
Page 40: ...2 1 OPERATION ...
Page 42: ...2 3 10 GENERAL VIEW 10 GENERAL VIEW 10 2 GENERAL VIEW OF CONTROLS AND GAUGES ...
Page 114: ...3 1 MAINTENANCE ...
Page 132: ...3 19 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS ...
Page 134: ...3 21 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS ...
Page 136: ...3 23 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS ...
Page 175: ...3 62 MEMO ...
Page 176: ...4 1 SPECIFICATIONS ...
Page 178: ...5 1 OPTIONS ATTACHMENTS ...
Page 188: ...4 3 25 SPECIFICATIONS 25 SPECIFICATIONS ...
Page 190: ...4 5 25 SPECIFICATIONS 25 SPECIFICATIONS ...
Page 192: ...4 7 25 SPECIFICATIONS 25 SPECIFICATIONS ...
Page 194: ...4 9 25 SPECIFICATIONS 25 SPECIFICATIONS ...
Page 195: ...4 10 MEMO ...