TRANSPORTING THE MACHINE
WEAM012101
175
9.
Connect the ropes to the upper lifting bar as indicated in the
figure.
IMPORTANT
q
Always use the three coupling points provided for lifting
the machine. Do not lift the machine with swing boom or re-
volving frame.
q
Pay attention to the pipes and take care that they do not get
caught.
10. Lift the machine slowly until the ropes are stretched and
make sure that the fastenings are correct before lifting the
machine definitively.
CAUTION
q
When lifting the machine, make sure that it is correctly bal-
anced and that it remains in horizontal position during the
lifting operations.
q
Do not lift the machine with swung boom or without using
the lifting bar.
RKA30100
RKA30110
Summary of Contents for PC18MR-3
Page 2: ......
Page 16: ...14 THIS PAGE WAS INTENTIONALLY LEFT EMPTY...
Page 24: ...22 PAGE INTENTIONALLY LEFT BLANK...
Page 25: ...SAFETY AND ACCIDENT PREVENTION 23...
Page 78: ...76 PAGE INTENTIONALLY LEFT BLANK...
Page 79: ...THE MACHINE AND ITS OPERATIONS 77...
Page 192: ...190 PAGE INTENTIONALLY LEFT BLANK...
Page 193: ...MAINTENANCE 191...
Page 255: ...TECHNICAL SPECIFICATIONS 253...
Page 263: ...AUTHORISED OPTIONAL EQUIPMENT 261...
Page 282: ...280 THIS PAGE WAS INTENTIONALLY LEFT EMPTY...
Page 283: ......
Page 284: ...2010 KOMATSU UTILITY EUROPE S p A All Rights Reserved Printed in Europe 06 2010...