TRANSPORTING THE MACHINE
WEAM012101
171
UNLOADING THE MACHINE
1.
Load and unload the machine on/from the trailer on firm and
level ground only, and widen the track gauge.
Keep a safety distance from the edge of the road.
2.
Operate the trailer brake and fit chocks (1) under the wheels
to prevent the trailer from moving.
Fit the ramps (2), with a maximum gradient of 15° (3) and
spaced equally from both sides of the trailer.
3.
Remove the chains and the metal cables with which the
machine has been secured.
4.
Start the engine and let it warm up completely.
5.
Make sure that the travel speed increase warning light is off.
NOTE
q
If the warning light is on, press the translation speed selector
switch located on the blade control lever grip. The warning light
will go out and the low speed will be selected.
Summary of Contents for PC18MR-3
Page 2: ......
Page 16: ...14 THIS PAGE WAS INTENTIONALLY LEFT EMPTY...
Page 24: ...22 PAGE INTENTIONALLY LEFT BLANK...
Page 25: ...SAFETY AND ACCIDENT PREVENTION 23...
Page 78: ...76 PAGE INTENTIONALLY LEFT BLANK...
Page 79: ...THE MACHINE AND ITS OPERATIONS 77...
Page 192: ...190 PAGE INTENTIONALLY LEFT BLANK...
Page 193: ...MAINTENANCE 191...
Page 255: ...TECHNICAL SPECIFICATIONS 253...
Page 263: ...AUTHORISED OPTIONAL EQUIPMENT 261...
Page 282: ...280 THIS PAGE WAS INTENTIONALLY LEFT EMPTY...
Page 283: ......
Page 284: ...2010 KOMATSU UTILITY EUROPE S p A All Rights Reserved Printed in Europe 06 2010...