108
USING THE WORK EQUIPMENT
3.13.4 CHANGING THE BUCKET
DANGER
•
When the coupling pins are removed or installed, chips
may come off; always use gloves, goggles and helmet.
•
The change of the equipment must be carried out by two
persons, who must decide together the words and signals
to use during operations.
•
Do not use your fingers to center the holes, since they
may be injured or even cut in case of sudden or uncon-
trolled movements.
•
The described procedures are valid also for the coupling
of the mechanical constraints of the optional equipment.
1 - Position the bucket on a level surface, directing it so that the
flat part of its back rests on the ground.
2 - Remove the tie rod pin (1) and the arm connection pin (2).
3 - Change the bucket, taking care to clean the pins, the bush-
ings and the seals perfectly and to grease the pins slightly
before reinstalling them.
IMPORTANT
☞
•
Install first the arm connection pin, making sure that the
seals are in good conditions.
4 - Put back all the safety pins (3) and lubricate by means of the
appropriate grease nipple.
RWA06040
3
1
2
3
Summary of Contents for PC12R-8
Page 2: ......
Page 12: ...10...
Page 20: ...18...
Page 21: ...SAFETY AND ACCIDENT PREVENTION...
Page 23: ...SAFETY NOISE AND VIBRATION PLATES 21 RWA05440...
Page 27: ...SAFETY NOISE AND VIBRATION PLATES 25 EMERGENCY EXIT LIFTING POINT RWA00190 RWA04920...
Page 55: ...THE MACHINE AND ITS OPERATIONS...
Page 88: ...86...
Page 120: ...118...
Page 121: ...MAINTENANCE...
Page 177: ...TECHNICAL SPECIFICATIONS...
Page 198: ...196...
Page 199: ...AUTHORISED OPTIONAL EQUIPMENT...