ARRANGEMENT FOR THE INSTALLATION OF THE DEMOLITION HAMMER (BREAKER)
6.2.3.2 REMOVING THE HAMMER
6.2.4 MAINTENANCE
To remove the hammer, proceed as follows:
1 - Stop the engine and move the hydraulic controls in all directions, in order to completely release the residual
pressures present in the circuits of the machine.
2 - Press the hammer control pedal to release the residual pressure present in the hammer delivery pipe.
3 - Slowly loosen the hydraulic oil filling cap to release the residual pressure from the tank.
4 - Disconnect the hammer feeding and draining pipes.
5 - Fit the sealing plugs of the rapid couplings.
6 - Disconnect the hammer from the mechanical constraints, as described in “3.13.4 CHANGING THE BUCKET”.
The hydraulic system does not require any maintenance operation and inspection other than those prescribed for
the machine.
For the maintenance operations required for the hammer, see the specific operation manual.
Summary of Contents for PC12R-8
Page 2: ......
Page 12: ...10...
Page 20: ...18...
Page 21: ...SAFETY AND ACCIDENT PREVENTION...
Page 23: ...SAFETY NOISE AND VIBRATION PLATES 21 RWA05440...
Page 27: ...SAFETY NOISE AND VIBRATION PLATES 25 EMERGENCY EXIT LIFTING POINT RWA00190 RWA04920...
Page 55: ...THE MACHINE AND ITS OPERATIONS...
Page 88: ...86...
Page 120: ...118...
Page 121: ...MAINTENANCE...
Page 177: ...TECHNICAL SPECIFICATIONS...
Page 198: ...196...
Page 199: ...AUTHORISED OPTIONAL EQUIPMENT...