![Komatsu D65EXi-18 Operation & Maintenance Manual Download Page 36](http://html1.mh-extra.com/html/komatsu/d65exi-18/d65exi-18_operation-and-maintenance-manual_1991131036.webp)
METHOD FOR USING AUTOMATIC BLADE CONTROL
PREPARATIONS FOR BLADE AUTOMATIC CONTROL
Before starting the blade automatic control, prepare or set the following.
Preparations in conformity to each site condition
• Set base station
• Method for configuring radios
• Project file setting
• Input pitching rod length (Power angle power tilt dozer)
• Method for inputting wear amount of blade edge and track shoe
• Set base point for checking blade elevation
Checks before starting
• Reset cylinder stroke end
• Set standard angle of blade edge (Sigma power pitch dozer)
• Check blade elevation, adjust
• Select active file
PREPARATIONS IN CONFORMITY TO EACH SITE CONDITION
SET BASE STATION
The base station communicates with the machine by using ra-
dio.
For the setting place of the base station, select such place that
there is no obstacle between the base station and jobsite so
that the radio signal can reach.
Also select setting place where has already been measured
and its coordinate has been determined.
For the usable base station, consult your Komatsu distributor in
advance.
For details of handling the base station, see the instruction
manual of the base station.
METHOD FOR CONFIGURING RADIOS
Set the radio of the control box matching with the specifications of GNSS radio device and the radio setting of
the base station.
Resetting is not necessary unless the settings of GNSS radio device and the base station are changed.
REMARK
Install GNSS radio device suitable for the radio specification of the base station.
For the usable GNSS radio device, consult your Komatsu distributor in advance.
1.
Set the base station and turn on the power supply.
MACHINE OPERATIONS AND CONTROLS
OPERATION
3-22
Summary of Contents for D65EXi-18
Page 2: ......
Page 74: ...Turn the machine to the direction of spreading MACHINE OPERATIONS AND CONTROLS OPERATION 3 60...
Page 91: ...HANDLE CONTROL BOX 4 1...
Page 176: ......
Page 177: ...SPECIFICATIONS 5 1...
Page 180: ......