![Komatsu 75001 Shop Manual Download Page 1249](http://html.mh-extra.com/html/komatsu/75001/75001_shop-manual_19911141249.webp)
SEN03858-00
50-700
6
WA250, 250PZ-6
700 Cab and its attachments
Removal and installation of operator's cab and floor frame assembly
Installation
q
Carry out installation in the reverse order to
removal.
[*1]
a
When installing the hoses of the air conditioner
circuit, take care that dirt, dust, water, etc. will
not enter them.
a
When installing each air conditioner hose,
check that O-ring (70) is fitted to it.
a
Check O-ring (70) for a flaw and deterioration.
a
When connecting each refrigerant pipe, apply
compressor oil for new refrigerant (R134a)
(DEN SO: ND-OIL8 or ZEXE L ZXL1 00 PT
(equivalent to PAG46) to O-ring (70).
3
Apply engine oil (EO15W-40) to threaded
part and seat of mounting bolt.
3
Threaded part of hose (M16 × 1.5):
12 – 15 Nm {1.2 – 1.5 kgm}
3
Threaded part of hose (M22 × 1.5):
20 – 25 Nm {2.0 – 2.5 kgm}
3
Threaded part of hose (M24 × 1.5):
30 – 35 Nm {3.0 – 3.5 kgm}
q
Charging with refrigerant (R134a)
Charge the air conditioner circuit with refriger-
ant (R134a).
a
Charge capacity:
1,200 ± 50 g
[*2]
Bleed air from the steering circuit. For details, see
Testing and adjusting, "Bleeding air from steering
circuit".
[*3]
Bleed air from the brake system. For details, see
Testing and adjusting, "Bleeding air from brake cir-
cuit".
[*4]
3
Right and left front operator's cab mounting
nuts (62):
824 – 1,030 Nm {84 – 105 kgm}
[*5]
3
Right and left rear operator's cab mounting
nuts (63):
824 – 1,030 Nm {84 – 105 kgm}
q
Refilling with oil (Hydraulic tank)
Add oil through the oil filler to the specified
level. Run the e ngin e to circulate the oil
through the system. Then, check the oil level
again.
5
Hydraulic oil (For details, see "Table of fuel,
coolant and lubricants"):
Only necessary quantity
q
Refilling with coolant
Add coolant through the coolant filler to the
specified level. Run the engine to circulate the
coolant through the system. Then, check the
coolant level again.
5
Total amount of coolant:
Approx. 22
l
(For details, see "Table of fuel, coolant and
lubricants")
Summary of Contents for 75001
Page 1: ...WHEEL LOADER SEN03813 03 WA250 6 WA250PZ 6 SERIAL NUMBERS WA250 75001 WA250PZ 75001 and up ...
Page 14: ...SEN03822 03 WA250 250PZ 6 00 100 13 Table of contents 100 Index ...
Page 56: ...SEN03823 01 WA250 250PX 6 00 200 41 200 Foreword and general information Conversion table ...
Page 59: ...SEN03824 00 01 100 2 WA250 250PZ 6 100 Specification and technical data ...
Page 77: ...SEN03825 00 10 100 8 WA250 250PZ 6 100 Engine and cooling system Cooling fan motor ...
Page 84: ...SEN03825 00 WA250 250PZ 6 10 100 15 100 Engine and cooling system Cooling fan motor ...
Page 87: ...SEN03826 00 10 200 2 WA250 250PZ 6 200 Power train ...
Page 111: ...SEN03826 00 10 200 26 WA250 250PZ 6 200 Power train Transfer Output shaft ...
Page 113: ...SEN03826 00 10 200 28 WA250 250PZ 6 200 Power train Transfer ...
Page 128: ...SEN03826 00 WA250 250PZ 6 10 200 43 200 Power train Torque proportioning differential ...
Page 138: ...SEN03826 00 WA250 250PZ 6 10 200 53 200 Power train Final drive ...
Page 141: ...SEN03827 01 10 300 2 WA250 250PZ 6 300 Steering system ...
Page 164: ...SEN03827 01 WA250 250PZ 6 10 300 25 300 Steering system Steering relief valve ...
Page 167: ...SEN03828 00 10 400 2 WA250 250PZ 6 400 Brake system ...
Page 169: ...SEN03828 00 10 400 4 WA250 250PZ 6 400 Brake system Charge valve Charge valve 1 ...
Page 188: ...SEN03828 00 WA250 250PZ 6 10 400 23 400 Brake system Parking brake ...
Page 213: ...SEN03830 00 10 600 16 WA250 250PZ 6 600 Hydraulic system Work equipment control valve ...
Page 217: ...SEN03830 00 10 600 20 WA250 250PZ 6 600 Hydraulic system Work equipment control valve ...
Page 221: ...SEN03830 00 10 600 24 WA250 250PZ 6 600 Hydraulic system Work equipment control valve ...
Page 225: ...SEN03830 00 10 600 28 WA250 250PZ 6 600 Hydraulic system Work equipment control valve ...
Page 248: ...SEN03830 00 WA250 250PZ 6 10 600 51 600 Hydraulic system PPC valve ...
Page 260: ...SEN03830 00 WA250 250PZ 6 10 600 63 600 Hydraulic system Accumulator for ECSS ...
Page 265: ...SEN03831 00 10 700 4 WA250 250PZ 6 700 Work equipment Work equipment linkage WA250PZ 6 ...
Page 283: ...SEN03831 00 10 700 22 WA250 250PZ 6 700 Work equipment Bucket positioner and boom kick out ...
Page 289: ...SEN03832 00 10 800 2 WA250 250PZ 6 800 Cab and its attachments ...
Page 300: ...SEN03832 00 WA250 250PZ 6 10 800 13 800 Cab and its attachments Air conditioner ...
Page 308: ...SEN03833 01 WA250 250PZ 6 10 910 5 910 Electrical system Part 1 Machine monitor system ...
Page 330: ...SEN03833 01 WA250 250PZ 6 10 910 27 910 Electrical system Part 1 Machine monitor ...
Page 350: ...SEN03834 01 WA250 250PZ 6 10 920 19 920 Electrical system Part 2 HST controller ...
Page 372: ...SEN03834 01 WA250 250PZ 6 10 920 41 920 Electrical system Part 2 Sensor ...
Page 386: ...SEN03836 01 30 110 3 WA250 250PZ 6 110 Testing and adjusting Part 1 ...
Page 546: ...SEN03839 00 WA250 250PZ 6 40 100 11 100 Failure code table and fuse locations Fuse locations ...
Page 674: ...SEN03843 00 WA250 250PZ 6 40 330 3 330 Troubleshooting by failure code Display of code Part 3 ...
Page 773: ...SEN03845 00 40 350 2 WA250 250PZ 6 350 Troubleshooting by failure code Display of code Part 5 ...
Page 813: ...SEN03846 00 40 360 2 WA250 250PZ 6 360 Troubleshooting by failure code Display of code Part 6 ...
Page 879: ...SEN03848 00 40 400 2 WA250 250PZ 6 400 Troubleshooting of electrical system E mode ...
Page 1275: ...SEN03860 01 90 100 2 WA250 250PZ 6 100 Hydraulic diagrams and drawings ...
Page 1278: ...SEN03860 01 WA250 250PZ 6 90 100 7 100 Hydraulic diagrams and drawings ...
Page 1281: ...SEN03861 01 90 200 2 WA250 250PZ 6 200 Electrical diagrams and drawings ...
Page 1292: ...SEN03861 01 WA250 250PZ 6 90 200 23 200 Electrical diagrams and drawings ...