![Kohler PW1000 1 kVA User Manual Download Page 27](http://html1.mh-extra.com/html/kohler/pw1000-1-kva/pw1000-1-kva_user-manual_1990181027.webp)
TS_600_00 PW1000 1-3kVA User Manual 6/4/17
21
3: Installation
Connect the battery cabinet to the UPS
1. On the UPS back panel, remove the screw securing the
hinged battery connector cover plate and let the cover plate
fall open.
2. Connect the DC cable from the battery cabinet to the
external battery connector on the back of the UPS cabinet.
3. With the battery cable inserted, fit the Anderson securing
plate over the battery connector plug.
4. Attach the Anderson securing plate (H) or (I) to the UPS
back panel using the screw you previously removed from
the hinged cover plate.
5. Remove the screw from the protective earth terminal on the
UPS rear panel.
6. Connect the earth tail from the DC cable to the UPS cabinet
chassis earth.
7. This completes the mechanical installation.
3.4.2 Combined tower installation
Figure 3.12 shows the method used to join the
battery cabinet to the UPS cabinet. This entails fitting
a small cabinet attachment link (G) between the
cabinets at the top and bottom and only fitting the
feet to the cabinets’ outer-edge. Proceed as follows:
1. Determine which side the battery cabinet is to be
installed relative to the UPS cabinet (either side
is permissible).
2. Remove the centre screws from mid-way along
the cabinet inner-sides where the attachment
links (G) are to be fitted. Note that a link is fitted
to the top and bottom of the cabinets, as shown
in Figure 3.12.
3. Lay the battery cabinet on its side and attach the
feet to its outer edge only (see Figure 3.10).
4. With the battery cabinet still on its side (with the
feet pointing downwards), carefully place the
UPS cabinet on top of the battery cabinet and fit
the two attachment links using the supplied
dome-headed screws (D). Ensure that the front
of the cabinets are correctly aligned before you
fully tighten the screws.
5. With the two cabinets now firmly held together, fit the two outer feet to the UPS cabinet.
6. Carefully stand the assembled tower upright and move to its intended installation location.
7. Connect the battery cables to the UPS as described above and illustrated in Figure 3.11.
8. This completes the mechanical installation.
3.4.3 Rack installation
When the battery cabinet is rack-mounted, install in the same manner used to install the UPS (see paragraph 3.3.3).
Figure 3.11 Battery cable connection
I
G
G
G
G
Figure 3.12 Combined tower installation