14
Spindle
Screws
Cover
Service Tunnel
Screw
18.
Bring the electrical cables into the
case.
19.
Strip back sufficient of the outer cable
insulation to enable routing to terminal
block.
20.
Fit an earth sleeve to the earth wire.
21.
Loosen the screws in the terminal
block and insert the bare wires into the
clamps.
L (Live) = Brown wire
E (Earth) = Green sleeved wire
N (Neutral) = Blue wire
Note!
Do not twist the cores of the
wires or strain the cables to make them
reach the terminal block.
22.
Connect the conductors firmly into the
terminal block. Make sure that the bare
cores of each conductor are securely
trapped within each conductor clamp.
23.
If necessary, fit an earth bonding
clamp to the supply pipe and ensure
that the bonding complies with the
relevant regulations in force at the time
of installation.
24.
Replace the service tunnel.
25.
Replace the cover. If the cover does
not fit easily, rotate the knobs slightly
so that they fit onto the spindles. Do
not force the cover.
26.
Tighten the three cover screws.
L
N
Electrical
Cables
Terminal
Block
Outlet
Connector
Cold Water Supply Pipe/
Inlet Connector