5.5 Initial start-up of the grinding machine
Place the grinding machine at the installation site on a level base.
Level out any uneven floors by adjusting the machine feet (3-2/6) with a flat wrench (SW19).
Have an authorized electrician install the current supply on-site.
Have the compressed air supply and the connection with the power supply installed on site by an
authorized specialist.
Completely install and check the protective equipment before commissioning.
Have the functionality of all protective equipment checked by authorized
trained personnel before commissioning the machine.
No work on the machine is to be performed unless by trained personnel.
Observe the locally applicable safety and accident prevention regula-
tions.
Have the functionality of all protective equipment (in particular the
electrical safety circuits) checked by authorized trained personnel before
commissioning the machine.
Confirm that the machine is correctly connected to the pressurized air
supply.
If connected incorrectly, pressurized air may leak, causing parts to spin
and potentially injure someone.
Observe local safety and accident prevention regulations for pressurized
air.
CAUTION
5. Installation