STANDARD WARRANTY CONDITIONS 

1. General information

This standard warranty (“Klover Warranty”) is issued by Klover Srl, San Bonifacio, Via A. Volta no. 8, for the products 

shown on the website 

www.klover.it

 (the “Products”). The Klover Warranty does not affect the rights provided for by 

European directive 99/44/EC or by Italian legislative decree no. 206/2005 “Consumer Code”, where applicable.  
The Klover Warranty is limited to Italy. Klover Srl invites Consumers not based in Italy to contact the dealer from which 

they bought the Product, to obtain the current warranty conditions.  

2. Activation of Warranty

The Klover Warranty must be activated, within 60 days from the date of purchase, on the websit

www.klover.it

 in the 

section 

“Register your warranty”

. The requested details should be completed, and a delivery note or other fiscal proof of 

purchase (e.g. receipt) should be attached). 

Alternatively, the warranty certificate, which can be found in each Product pack (the “Warranty Certificate”) must be sent 

to Klover Srl, within the same period of 60 days from the date of purchase, by following the instructions on the certificate. 

When registering or sending the guarantee, please ensure that the customer copy of the Warranty Certificate is retained. 
It must be duly completed and signed by the Consumer and by the installer, together with the delivery note or other form 

of proof of purchase, in order for the Klover Warranty to be valid.   

3. Two-year Klover Warranty

The Klover Warranty covers the free repair of the Product all parts of the Product that are found to be defective at origin, 

due to defects confirmed by Klover Srl to be exclusively attributable to the manufacturer. If it is not possible to repair the 
Product in any way, it will be replaced. In both cases, there will be no change to the expiry or terms of the warranty provided 

when the Product was purchased. 

The  Klover  Warranty  offers  all  the  advantages  of  a  service  guaranteed  directly  by  Klover  Srl  through  its  network  of 

authorised  service  centres  (Centri  di  Assistenza  Tecnica  or  “C.A.T.”)  in  Italy.  The  list  can  be  found  on  the  website 

www.klover.it. 

The Klover Warranty will remain in effect for a period of 2 years from the date of purchase, if proven by a delivery note or 

other proof of purchase (e.g. receipt), stating the name of the seller, the product that was bought, and the date of purchase. 

Product components replaced by an authorised dealer at the Consumer’s expense as they were “out of warranty” after 

expiry of the two-year period will be guaranteed by Klover Srl for one year from the date of replacement, excluding costs 

of intervention, labour and ancillary costs.  

4. Five-year Klover Warranty

If the First Switch-on service is provided by an authorised dealer, within 3 months from the date of purchase, the Consumer 

will be entitled to the Warranty on the main boiler unit for a period of 5 years from the date of purchase.  

The cost of the First Switch-on service is paid by the Consumer.  

This Klover Warranty is valid on condition that the seasonal maintenance is performed by the local service centre as 
indicated in the user manual (for example, Safe Top boiler units require annual use of the Long Life protection). 

The First Switch-on Report, duly completed and signed, must be kept carefully to ensure that the Klover Warranty remains 

operational. 

5. Complaints and Assistance

As provided for by Legislative Decree 24/2002, complaints should be sent to the retailer through whom the Product was 
bought. 

Once the retailer has checked that the Klover Warranty is in force and has not been invalidated, they will contact the local 

service centre to agree the terms of intervention to verify and eliminate the reported fault. If the Consumer contacts the 

service centre directly, the service centre must immediately inform the retailer from whom the Product was bought. 

If, while inspecting the Product, the service centre finds that the reported defect is not one of the defects covered by the 
Warranty, the call-out and any works completed, will be paid by the Consumer. 

In order to improve the service and reduce intervention time, Consumers are asked to provide the details of the Product 

they are calling about. In particular, the following information should be provided: • Warranty Certificate number • the name, 

model and serial number of the Product • the date of purchase • the reported defect.  

Klover Srl will not be liable for any delays in carrying out repairs or replacements of the Product. 

Summary of Contents for ECOMPACT 150

Page 1: ...ENGLISH Pellet burning boiler ECOMPACT 150 190 250 290 INSTALLATION USE MAINTENANCE AND HELPFUL TIPS Main Revision 1 1 FPH_supplement 001...

Page 2: ......

Page 3: ...tiva l armonizzazione delle legislazioni degli stati membri relative alla compatibilit elettromagnetica 2014 30 UE 26 February 2014 on the harmonization of the laws of the Member States relating to el...

Page 4: ...tiva l armonizzazione delle legislazioni degli stati membri relative alla compatibilit elettromagnetica 2014 30 UE 26 February 2014 on the harmonization of the laws of the Member States relating to el...

Page 5: ...tiva l armonizzazione delle legislazioni degli stati membri relative alla compatibilit elettromagnetica 2014 30 UE 26 February 2014 on the harmonization of the laws of the Member States relating to el...

Page 6: ...tiva l armonizzazione delle legislazioni degli stati membri relative alla compatibilit elettromagnetica 2014 30 UE 26 February 2014 on the harmonization of the laws of the Member States relating to el...

Page 7: ...EXTERNAL AIR INTAKE 16 THE FLUE AND CONNECTION TO THE SAME 16 CHIMNEY 18 ELECTRICAL CONNECTION 19 CONTROL OF ANY COUPLED BOILER 19 CONTROL OF A POSSIBLE THREE WAY MOTORIZED VALVE FOR DHW SYSTEM MANAGE...

Page 8: ...g water as heat transfer fluid Every single detail of the product is manufactured by qualified staff using the most advanced equipment The manual contains a detailed description of the appliance and i...

Page 9: ...al can damage the appliance operation voiding the warranty and exempting the manufacturer from all liability Do not use the appliance as an incinerator or for any use other than that for which it was...

Page 10: ...FIC LAWS IN FORCE IN THE COUNTRY WHERE THE MACHINE IS INSTALLED MUST BE OBSERVED NON ROUTINE MAINTENANCE MUST ONLY BE PERFORMED BY AUTHORISED AND QUALIFIED STAFF To ensure the validity of the warranty...

Page 11: ...indicates the pressure of the heating system High efficiency circulating pump for heating system Combustion chamber door Display FRONT VIEW LEFT FRONT TECHNICAL COMPARTMENT Terminal for room thermosta...

Page 12: ...6 PELLET BURNING BOILER ECOMPACT 150 190 250 290 EN Rev 1 1 Overall dimensions ECOMPACT 150 190...

Page 13: ...7 PELLET BURNING BOILER ECOMPACT 150 190 250 290 EN Rev 1 1 Overall dimensions ECOMPACT 250 290...

Page 14: ...ections M System Delivery 3 4 M R System Return 3 4 M F Domestic cold water inlet on prepared models only 1 2 M C Domestic hot water outlet on prepared models only 1 2 M S Upper or rear flue gas outle...

Page 15: ...ections M System Delivery 3 4 M R System Return 3 4 M F Domestic cold water inlet on prepared models only 1 2 M C Domestic hot water outlet on prepared models only 1 2 M S Upper or rear flue gas outle...

Page 16: ...Expansion vessel litres preloading bar 10 1 Maximum operating recommended pressure bar 2 5 1 5 Water side resistance at t 20 K mbar 135 Flue outlet diameter mm 100 Air intake pipe diameter mm 40 Minim...

Page 17: ...Expansion vessel litres preloading bar 10 1 Maximum operating recommended pressure bar 2 5 1 5 Water side resistance at t 20 K mbar 145 Flue outlet diameter mm 100 Air intake pipe diameter mm 40 Minim...

Page 18: ...t 3 2 Nominal voltage V 230 Nominal frequency Hz 50 Expansion vessel litres preloading bar 10 1 Maximum operating recommended pressure bar 2 5 1 5 Water side resistance at t 20 K mbar 184 Flue outlet...

Page 19: ...t 3 2 Nominal voltage V 230 Nominal frequency Hz 50 Expansion vessel litres preloading bar 10 1 Maximum operating recommended pressure bar 2 5 1 5 Water side resistance at t 20 K mbar 211 Flue outlet...

Page 20: ...we recommend using good quality pellets Pellets should be poured into the tank using a shovel and not directly from the bag Good quality pellets should have the following properties Constant diameter...

Page 21: ...requirement appropriate measures e g load distribution plate must be taken The minimum safety distance from flammable materials must be at least 200 mm from the sides and 100 mm from the back of the...

Page 22: ...le 15 cm minimum diameter The hole must be protected externally with a fixed grille The protective grille must be checked periodically to ensure that it is not obstructed thereby impeding the passage...

Page 23: ...de of suitable non combustible materials conforming to the applicable regulations Aluminium and fibre cement pipes are forbidden Orientation and initial vertical rise The flue system should run as ver...

Page 24: ...eight of not less than 4 5 m measured vertically from the outlet of the stove to the top of the chimney should be satisfactory Alternatively the calculation procedure given in BS EN 13384 1 2002 may b...

Page 25: ...must ensure that the standard boiler stops when the pellet appliance takes over the heating of the system The electrical setting which is accessible from the left hand technical compartment intervene...

Page 26: ...water temperatures in the boiler For this reason it is recommended that the heating system is not entirely closed In the configuration System type 3 the appliance switches to economy mode and then swi...

Page 27: ...NSTREAM OF THE RETURN PIPE ON THE APPLIANCE The appliance must be mounted exclusively by qualified personnel Scrupulously comply with the instructions given in this guide The manufacturer declines any...

Page 28: ...hows the display when setting or programming operating parameters Set 1 2 3 6 5 4 The INPUT area shows the entered programming values The MENU LEVEL area shows the current parameter menu level The DIA...

Page 29: ...e changes made 6 Increase power 3 Working off Increases the working fan power of the appliance Menu mode Moves you to the previous menu item Programming mode Moves you to the previous submenu item sto...

Page 30: ...Allows you to enable disable and set the programmable thermostat weekly program functions MENU LEVEL SELECTION MEANING POSSIBLE VALUES 03 03 01 WEEK TIMER Enable disable the weekly programme ON OFF T...

Page 31: ...KEND TIMER Enable disable the weekend programme ON OFF 03 04 02 START 1st WEEKEND Turn on time of the first programme Time OFF 03 04 03 STOP 1st WEEKEND Turn off time of the first programme Time OFF 0...

Page 32: ...ing to the type of system is has been connected to see System configuration INITIAL START UP System configuration Before commissioning the appliance it is advisable to choose which type of system it h...

Page 33: ...ernative generator in order to guarantee constant DHW in this type of system Control of this combination is ensured by a three way motorised valve connected to the pellet boiler This allows the DHW ge...

Page 34: ...ollows Check the seal of all piping the expansion vessel and the circulation pump Open the automatic air release valve on the appliance Open the system load cock mounted on the appliance to load the s...

Page 35: ...message FIRE This step is used to allow the fire to spread evenly across the brazier and burn all the unburned pellets from the previous phases After these phases the appliance enters the work mode at...

Page 36: ...n the display will appear as in the following picture Set 1 2 3 6 5 4 After setting the desired value press button 4 or wait a few seconds to confirm During the working mode the appliance enters Econo...

Page 37: ...on of the combustion chamber after a long period of inactivity is not to be considered as a manufacturing fault Any perceived noise during operation may be caused by the expansion settling of the plat...

Page 38: ...d the appliance will enter the STOP FIRE stand by mode running the entire switch off cycle until cooling When this phase is over the appliance can be restarted resuming work at the set power Previous...

Page 39: ...e appliance to switch off immediately The alarm state is reached after the time set on Pr11 set as default at 60 and it can be reset by pressing button 4 for a while CLEANING AND MAINTENANCE Precautio...

Page 40: ...deposited under the brazier Figure 3 To remove any deposits it is also recommended that you scrape the inner walls of the combustion chamber with a spatula Do not use tools that can reduce the thickn...

Page 41: ...t least every 90 days so as to always guarantee efficient performance and optimal operation Please proceed as follows Perform routine cleaning Remove the extractor flue gas pass inspection front plate...

Page 42: ...ation it is necessary to remove the sawdust deposited on the base of the tank Figure 10 at least once every 30 days The pellet tank must be emptied at the end of every season Cleaning the ceramic glas...

Page 43: ...UALITY PELLETS TO OBTAIN THE BEST RESULTS Maintenance Timely and systematic maintenance is essential for guaranteeing correct operation optimal heat performance and durability of the device Therefore...

Page 44: ...level sensor enable PELLET RESERVE On off On off On Pr50 M08 4 13 Pump start threshold and power modulation for overheating safety PUMP SAFETY C 60 90 80 Pr51 M08 4 14 3 way switching and re ignition...

Page 45: ...Pr19 M08 6 19 Flue gas extraction speed in power 2 work phase P 2 FLUE GAS SPEED RPM 500 2800 1650 Pr20 M08 6 20 Flue gas extraction speed in power 3 work phase P 3 FLUE GAS SPEED RPM 500 2800 1750 Pr...

Page 46: ...ulator cleaning gear motor TURBOLAT DURATION Seconds 0 600 120 Pr56 M08 4 19 ON time for brazier cleaning gear motor NOT USED CLEANING TIME Seconds 0 120 0 Pr57 M08 4 20 Time from switching off after...

Page 47: ...Flue gas extraction speed in power 5 work phase P 5 FLUE GAS SPEED RPM 500 2800 2200 Pr23 M08 6 23 Exchanger 1 motor speed in output 1 working mode NOT USED AIR 1 SPEED Volt 65 225 65 Pr24 M08 6 24 E...

Page 48: ...ulator cleaning gear motor TURBOLAT DURATION Seconds 0 600 120 Pr56 M08 4 19 ON time for brazier cleaning gear motor NOT USED CLEANING TIME Seconds 0 120 0 Pr57 M08 4 20 Time from switching off after...

Page 49: ...Flue gas extraction speed in power 5 work phase P 5 FLUE GAS SPEED RPM 500 2800 2000 Pr23 M08 6 23 Exchanger 1 motor speed in output 1 working mode NOT USED AIR 1 SPEED Volt 65 225 65 Pr24 M08 6 24 E...

Page 50: ...ulator cleaning gear motor TURBOLAT DURATION Seconds 0 600 120 Pr56 M08 4 19 ON time for brazier cleaning gear motor NOT USED CLEANING TIME Seconds 0 120 0 Pr57 M08 4 20 Time from switching off after...

Page 51: ...Flue gas extraction speed in power 5 work phase P 5 FLUE GAS SPEED RPM 500 2800 2200 Pr23 M08 6 23 Exchanger 1 motor speed in output 1 working mode NOT USED AIR 1 SPEED Volt 65 225 65 Pr24 M08 6 24 E...

Page 52: ...46 PELLET BURNING BOILER ECOMPACT 150 190 250 290 EN Rev 1 1 WIRING DIAGRAM...

Page 53: ...over it The Klover Warranty will remain in effect for a period of 2 years from the date of purchase if proven by a delivery note or other proof of purchase e g receipt stating the name of the seller t...

Page 54: ...elated to improper functioning of the chimney flue Defects in the Product caused by negligence accidental breakage normal wear and tear tampering and or damage during transport scratches dents etc inc...

Page 55: ...49 PELLET BURNING BOILER ECOMPACT 150 190 250 290 EN Rev 1 1...

Page 56: ...Cod CS IST ECO EN FP KLOVER Srl Via A Volta 8 37047 San Bonifacio VR VAT No 02324280235 www klover it...

Reviews: