26
PELLET-BURNING BOILER ECOMPACT 150-190-250-290
EN -
Rev 1.1
when it is filled for the first time. Warning: once the operation has been completed, before switching on the
appliance you should empty the accumulation of pellets deposited inside the brazier.
Menu 07
–
Fireplace status
It allows for viewing the instantaneous state of the appliance, by showing the state of the various devices connected to it.
Several pages are displayed in succession. The data is reserved for Technical assistance Centre.
Menu 08
–
Technical calibration
Allows you to access all data reserved for the Technical Assistance Centre. Access is protected by a password.
Unauthorised access can cause serious damage to the equipment, to things and the environment as well as personal
injuries.
Menu 09
–
System type
Allows you to configure the appliance according to the type of system is has been connected to
(see
“System
configuration”
)
.
INITIAL START-UP
System configuration
Before commissioning the appliance it is advisable to choose which type of system it has been connected to, by
accessing “Menu 06 – System type”.
The available configurations are given here below:
PLUMBING LAYOUT “1”
– Boiler connected to a heating system and (potentially) an external plate heat exchanger for
the generation of DHW.
T.A.
AB
B
A
Plumbing layout 1 involves the connection of the boiler to a heating system (or centralised buffer) managed by one or
more room thermostats. These are connected to the terminal provided inside the left technical compartment on the
appliance. DHW generation, where required, will be achieved using a plate heat exchanger fitted externally to the boiler
and controlled by a flow-switch. This is also connected to a terminal provided on the boiler. This serves to bring the
appliance immediately to DHW output working mode and to switch a three-way motorised valve to give it priority.