WOOD BURNING BOILER COOKER ALTEA 110 SICURO TOP
7
EN - Rev. 1.2
Return pipe connection of the heating system.
REAR VIEW OF PLUMBING CONNECTIONS
Air intake pipe.
Delivery pipe connection of the heating
system with check valve.
Domestic hot water outlet pipe connection
(on prepared models only).
DCW inlet pipe connection.
+ System load.
+ Boiler unit load.
Safety valve drain connection.
REAR VIEW of LEFT-SIDE TECHNICAL
COMPARTMENT
Boiling discharge pipe connection
SICURO TOP.