ZRB46
Burner
Tube
Removal
1. Remove the six [6] DT screws from the lower portion of the Burner Tube Mount Brackets.
2. Slide the Burner Tube away from the Plumbing Connection until it disengages from the orifice.
3. Reverse these steps to reinstall.
ZRB46
Burner
System
Removal/Installation Guide
-
Warning-
Turn off Unit and allow to cool before cleaning. Only a Qualified service technician
should service and repair this appliance.
Burner Pan
Remove Valve
Heat Shield
Before Lifting Out
Burner Assembly
Pilot Shield
#5143ZDV-258-2
False Bottom
#46ZRB-256
1. Lift off Valve Access Cover. Remove Valve Heat Shield.
2. Remove the Glass Door from the unit. Remove liners if present. Remove DT screws and lift out the False Bottom.
3. Remove the DT screws around the perimeter of the burner pan.
4. Carefully work the burner pan loose & lift the assembly upward to remove it from the firebox cavity.
5. Installation is the reverse of these steps. Ensure that the mounting surface is clean & fresh
Black
Mill Pac
is used to reseal the
burner pan.
32
Summary of Contents for ZRB46
Page 31: ...Gas Conversion for Modulator PART C WARNING WARNING 31...
Page 41: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 41...
Page 42: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 42...
Page 63: ...PVCM Schematic Millivolt 63...
Page 67: ...PVCM Schematic IPI 67...
Page 68: ...68...