MQ Log F9 Setup
NOTE: Set Primary Air Opening at 3/16” for Natural Gas.
Refer to Gas Conversion and Burner Removal sections in manual.
*
These items are supplied with the fireplace.
Pull up [4] Log Tabs on Burner.
Match with Holes in Logs 4 & 5.
Logs 1-3
are placed against back wall of firebox.
Logs 4 & 5
are placed onto Log Tabs on Burner.
LOG 6 PLACEMENT- NATURAL GAS
LOG 6 PLACEMENT- PROPANE
Log 6 & 7
are placed as shown, depending on which fuel is used.
(
Continued)
1
2
3
4
5
6
9
8
7
Pull Up [4] Log Tabs
*Vermiculite
*Lava Rock
*Embers
2
*Insulation Wool
10
3
*10 Piece Log Set.
Lava Rock, Insulation Wool, Vermiculite, and Embers are supplied with fireplace.
1
5
4
6
7
6
7
52
Summary of Contents for marquis ZCV39LPE2
Page 62: ...Gas Conversion for Modulator PART C 62...
Page 67: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 67...
Page 68: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 68...
Page 75: ...Proflame 2 Remote Control 75...
Page 77: ...77...