ZCV39 / ZCV42
Basic Finishing 2: With S1 or S1PF Surround
Step One: Frame Fireplace with nailing tabs oriented as
shown.
Step Two: Use Drywall to finish face of wall.
NOTE: Drywall will be flush with fireplace face.
Step 3: Once wall is completely finished, Screen with Surround
may be installed. Surround will conceal edges of fireplace.
IMPORTANT NOTE!:
If installing tile, brick, or other non-
combustible material around the perimeter of the surround:
you MUST Leave 4” of the face exposed around the fireplace
opening on the Bottom and Sides, and 4-1/16” exposed on the
top. This is to install and remove the surround. See drawings
below. A Tile Lip Kit is Available. Part No. ZCV-TLK
Nailing Tab
4-1/16” MIN
ZCV39
Fireplace
Opening
Drywall
4” MIN
Fireplace Frame
Required
Clearance
S1 Surround
Drywall
S1 or S1PF Surround
Drywall
(Continued on Next Page)
Bottom of Unit
23
Summary of Contents for marquis ZCV39LPE2
Page 62: ...Gas Conversion for Modulator PART C 62...
Page 67: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 67...
Page 68: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 68...
Page 75: ...Proflame 2 Remote Control 75...
Page 77: ...77...