MQZCVBG34
-Gas Conversion Part A-
Models:
MQZCVBG34NE2, MQZCVBG34LPE2
Kit Number
Description
Pilot Orifice
Burner Orifice
Brass (1000-255)
Brass Nipple
Air Shutter
Hi/Lo Regulator
34BG-CKLPI2
Propane Conversion
-IPI-
1001-P168SI
#35
(977.168)
#51
1000-253 Close
Fully Open
1002-P012SI
(907.012)
34BG-CKNGI2
NG Conversion
-IPI-
1001-P166SI
#62
(977.166)
#39
1000-253 Close
1/8
”
1002-P013SI
(907.013)
IMPORTANT: Always check for gas leaks with a soap and water solution. DO NOT USE OPEN FLAME FOR LEAK TESTING.
⚠
Caution:
The gas supply shall be shut off prior to disconnecting the electrical power, before proceeding with the conversion.
1. The Burner Tube must be removed from the Burner Pan Assembly (See
Burner Tube Removal
). Adjust the Air Shutter to the correct Primary Air
setting as specified in the manual or on the label plate. To adjust the
Primary Air setting, loosen screw on the side of the Air Shutter and rotate
to the correct opening using a drill bit or tape measure. Retighten screw.
2.
Remove the Main Orifice using a ½” wrench and replace with the new
Conversion Orifice which came with the Conversion Kit.
3.
Replace the Burner Tube. Install the new Pilot Orifice (See
Pilot
Conversion
) and Hi/Lo valve regulator by following instructions supplied
with the Conversion Kit.
•
Refer to
Gas Specifications Chart
for inlet pressures and
input ratings.
•
Clock meter to verify input rate.
•
Place conversion label as close to converted gas control as
possible.
•
Refer to
lighting instructions
to verify the normal operating
sequence of the ignition system.
•
Refer to
Burner System Maintenance
for proper relationship
of the pilot flame to the main burner and for main burner flame
appearance.
⚠
Warning
This conversion kit shall be installed by a qualified service agency in accordance with the manufacturer's
instructions and all applicable codes and requirements of the authority having jurisdiction. If the
information in these instructions is not followed exactly, a fire, explosion or production of carbon
monoxide may result causing property damage, personal injury or loss of life. The qualified service agency
is responsible for the proper installation of this kit. The installation is not proper and complete until the
operation of the converted appliance is checked as specified in the manufacturer's instructions supplied
with the kit.
Burner Mount
Air Opening
Orifice
Pilot
Valve
Parts List (SIT):
•
HI/LO Pressure Regulator
Assembly
•
Burner Orifice
•
Brass Nipple
•
Instructions
•
Conversion Kit Label
•
Pilot Orifice
Note: Air Shutter Adjustment
can be made by removing
access cover on Media Tray.
Access Cover
56
Summary of Contents for MQZCVBG34LPE2
Page 58: ...Gas Conversion for Modulator PART C 58...
Page 64: ...Proflame 2 Remote Control 64...
Page 66: ...FAN OPTION NOT AVAILABLE 66...