MQZCV34BG Framing Dimensions- Recessed Front Chase with Open Top
The top of the chase must have an opening of 2-1/4” on 3 sides.
NOTE: These structures are not load bearing.
Framing for Horizontal Vent
Termination
(See
Installation of Side
Wall Venting
Section)
No loose Combustibles (wood, wiring, etc.) are
allowed inside the open Chase area.
RIGHT SIDE
2-1/4” From Ceiling or
Top of Enclosure
Top of Chase Open
on 3 Sides
Top of Chase
Open on 3
Sides
TOP OF CHASE
OPEN ON 3 SIDES
Unit and Framing
can be covered
with a combustible
i.e., drywall.
8” MIN from top of pipe
to enclosure top.
No Crossmember
at front of Chase
2-1/4”
Max 4.25 to back
side of Chase
17
Summary of Contents for MQZCVBG34LPE2
Page 58: ...Gas Conversion for Modulator PART C 58...
Page 64: ...Proflame 2 Remote Control 64...
Page 66: ...FAN OPTION NOT AVAILABLE 66...