SECTION 2
INSTALLATION OF FIRE
2.1
UNPACKING THE COMBUSTION CHAMBER
Carefully lift the combustion chamber out of the carton. Remove the loose item
packaging carefully from the pack. Check the contents as listed :-
DO NOT UNDER ANY CIRCUMSTANCES USE THIS APPLIANCE IF THE
GLASS PANEL IS BROKEN OR NOT SECURELY FIXED TO THE FIREBOX.
Packing Check List
Pack 1 of 2 - Combustion Chamber Pack
1 off
Combustion Chamber & Glass Frame Assembly
1 off
Proclaim Fascia (packed in front section of combustion chamber pack)
1 off
Boxed ceramic fuel-bed set (packed inside combustion chamber)
1 off
Installation Instruction Manual
1 off
User Instruction Manual
1 off
Flue Terminal Guard
1 off
Loose Items pack – containing :- 6 off M6 wingnuts
4 off No. 12 x 40mm Screws
4 off Rawlplugs
Carefully lift the flue kit components out of the carton. Remove the loose item
packaging carefully from the pack. Check the contents as listed :-
Pack 2 of 2 - Flue System Pack
1 off
Flue Terminal
1 off
150mm Starter Pipe
1 off
*Telescopic Flue Pipe - supplied in two seperate sections
1 off
90 degree elbow
3 off
Pipe Clips
*These two sections of the telescopic need to be assembled by the
installer to form the 250mm to 410mm telescopic piece.
7