15
Method of Operation
Load Screws Into the Chamber
Turn off the power first, and open the Top Cover Box. Ensure the screws are loaded without
foreign materials, pour in screws until they come up to 1~2mm below the top on both sides of
the rails.
Can contain screws between 200~220cc. All objects other than applied screw are deemed as
foreign material which should be removed first; or it will affect the performance of this machi