Installation Note N5242-90003 15
Description of the Upgrade
Installation Procedure for the Upgrade
For analyzers with serial numbers prefixed MY/SG/US5310 and below:
— W25A28 port 2 bridge to front-panel REF 2 SOURCE OUT
Figure 4
Existing Test Set Cables Removal
Step 6. Assemble the Mechanical Switches
Refer to
for this step of the procedure. New parts are listed in
1.
Position each mechanical switch on a switch bracket as shown.
2.
Secure each switch to its bracket using two screws (item
①
, 0515-1992)
for each. Make sure that the switches are oriented as shown.
3.
Position the A50 combiner on one of the switch brackets as shown. This
will be the bracket with the A46 port 1 mechanical switch.
4.
Secure the A50 combiner to the bracket using two screws (item
➁
,
0515-1410). Make sure that the A50 combiner is oriented as shown.