Installation Note N5242-90003 17
Description of the Upgrade
Installation Procedure for the Upgrade
Figure 6
Mechanical Switches Installation into the Analyzer
Step 8. Install the Second Source Boards
Part 1: Install Cables on Second Source Boards
Refer to
for this step of the procedure. New parts are
listed in
.