PRE-INSTALLATION
Notes:
-
Products are connected end-to-end via the integrated connectors at each end of the product.
Note that there is an “input” and “output” connector on each product and orientation is critical.
A common mistake is installing the products backwards.
A typical run installation includes:
• X96 controller
• 4-conductor cable (16 AWG [1.5 mm
2
]) (ex. QSH-CBLP-M-500)
• 10 in to 15 ft (254 mm to 4.6 m) or 24 ft (7.3 m) LS0 linear luminaires
• Adapters
• Right angle covers
• Mounting brackets
Input
Input
Input
Input
Output
Output
Output
Output
7 |
LS0
INSTALLATION GUIDE
P/N 3662707 Rev A
© 2022 Lutron Electronics Co., Inc. All rights reserved.
Summary of Contents for LS0
Page 1: ...LS0 LOW VOLTAGE LINEAR Installation Guide Models CM LS0 Coming in Phase 2 HW LS0...
Page 14: ...LS0 LIN AIRE BASSE TENSION Guide d installation Mod les CM LS0 venir dans la phase 2 HW LS0...
Page 27: ...LS0 LINEAL DE BAJO VOLTAJE Gu a de instalaci n Modelos CM LS0 que viene en Fase 2 HW LS0...