Installation
37 / 144
04/2017
Installation in an exposed drainage pipe
Installation in the concrete slab
3.6
Aligning the drain body horizontally
77
Fig. [10]
77
Fig. [11]
Fig. [12]
3.7
Installation in the concrete slab (black tub)
Clamp the on-site sealing sheet <68> between the pressure sealing flange
<13> and the counterflange <47> and screw together using the
screws <48>.
Note: If there is no on-site sealing sheet available, the KESSEL
sealing gasket set art. # 83023 incl. elastomer waterproofing
sheet must be used.
3.8
Installation in the concrete slab (white tub)
Insert the sealing gasket <37> in the base <1> and make sure the
sealing gasket is in place correctly. Then grease the upper side of the
sealing gasket. Push the extension section central flange <33> in
and move it into position.
48
47
68
13
Fig. [13]
37
33
1
Fig. [14]
Summary of Contents for Ecolift
Page 22: ...22 144 DOP Leistungserkl rung 04 2017 6 DOP Leistungserkl rung...
Page 23: ...DOP Leistungserkl rung 23 144 04 2017...
Page 46: ...46 144 Declaration of performance 04 2017 6 Declaration of performance...
Page 47: ...Declaration of performance 47 144 04 2017...
Page 71: ...D claration de performance 71 144 04 2017 6 D claration de performance...
Page 94: ...94 144 DoP Dichiarazionediprestazione 04 2017 6 DoP Dichiarazione di prestazione...
Page 95: ...DoP Dichiarazionediprestazione 95 144 04 2017...
Page 118: ...118 144 DOP vermogensverklaring 04 2017 6 DOP vermogensverklaring...
Page 119: ...DOP vermogensverklaring 119 144 04 2017...
Page 142: ...142 144 DOP Deklaracja w a ciwo ci u ytkowych 04 2017 6 DOP Deklaracja w a ciwo ci u ytkowych...
Page 143: ...DOP Deklaracja w a ciwo ci u ytkowych 143 144 04 2017...