49/168
2016/05
MAINTENANCE
6.3.3
Preparing the station for maintenance, draining
• Close the intake and ensure that no wastewater can flow in
• Pump the station empty, for this either
- fill with water until pump 1 starts. Turn off the water intake, the pump will run until the level „minimum“ is reached
or
Attention: Danger of material damages! Pump must not run dry
- Use the control unit (manual control) to control the pump until the wastewater container is empty.
• Cut the power supply to the station and secure against accidental activation.
• If present, close the shut-off valve in the pressure pipe.
• Empty the pressure pipe, put the ventilation unit (as described hereafter, all backflow protection devices present)
in the OPEN position, the water flows from the pressure pipe into the wastewater container.
• Return the ventilation unit to the CLOSED position.
Plastic fitting
Ventilation unit OPEN:
Control lever in position <23>.
Ventilation unit CLOSED:
Control lever in position <24>.
Grey cast iron fitting
Ventilation unit OPEN:
Adjusting bolt in position <23>.
Ventilation unit CLOSED:
Adjusting bolt in position <24>.
[19]
[20]
23
23
A.
B.
A.
B.
24
24
Summary of Contents for Aqualift F XL Duo
Page 2: ...2 168 2016 05...
Page 26: ...26 168 2016 05 DOP 9 DOP...
Page 27: ...27 168 2016 05 DOP...
Page 30: ...30 168 2016 05...
Page 54: ...54 168 2016 05 DOP 8 DOP...
Page 55: ...55 168 2016 05 DOP...
Page 58: ...58 168 2016 05...
Page 82: ...82 168 2016 05 DOP 9 DOP...
Page 83: ...83 168 2016 05 DOP...
Page 86: ...86 168 2016 05...
Page 110: ...110 168 2016 05 DOP 9 DOP...
Page 111: ...111 168 2016 05 DOP...
Page 114: ...114 168 2016 05...
Page 138: ...138 168 2016 05 DOP 9 DOP...
Page 139: ...139 168 2016 05 DOP...
Page 142: ...142 168 2016 05...
Page 166: ...166 168 2016 05 DOP 9 DOP...
Page 167: ...167 168 2016 05 DOP...