background image

6

Screw  in  and  tighten  the  long  fastening 
screws into the upper sleeves.
Screw  in  and  tighten  the  short  fastening 
screws into the lower sleeves.
If  appropriate,  install  any  accessories  in-
cluded  in  the  scope  of  delivery,  such  as  a 
towel rod, (see separate instructions).

Mount the upper fastenings (see Fig. 6–9)

Mark the drill holes (see Fig. A).
Drill the holes and insert the anchors.
At the wall adapters screw out the securing 
screws and pull out the retainers. 
Screw  on  the  wall  adapters  with  hexagon 
socket screws. Take the position of the drill 
hole into account. 
Insert the retainers into the wall adapters. 
Take the position of the openings into ac-
count.
Only screw on the retainers handtight with 
the securing screws. This allows the retain-
ers to still be moved for alignment.

Pre-install the lower spacers (see Fig. 10–11) 

Use  a  knife  to  cut  the  two  snap-in  bolts 
at  the  second  marking  to  the  dimension 
49 mm. 
Install both spacers on the radiator.

Suspend and align the radiator (see Fig. 12–
15) 

Suspend  the  radiator  via  the  screws  into 
the retainers. Ensure that the radiator does 
latch in.
In  order  to  align  the  radiator  sideways: 
Slide the retainers.
In order to set the wall clearance: Pull out 
or push in the retainers.
In order to set the height: Turn the adjust-
ing screw at the retainer.

Install the lower spacers and fasten the radia-
tor (see Fig. 16–27) 

Turn out the lower spacers until these are 
positioned flat at the wall and the radiator 
hangs straight.
Tighten the upper securing screws.
Mark the lower drill holes for the spacers.
Press  the  locking  clamp  to  the  rear  and 
hang out the radiator. Put down the radia-
tor with installed heating element so that 
the cable is not bent or damaged.
 
Drill the holes and insert the anchors at the 
lower markings.
Dismantle both spacers.





Screw both snap-in bolts tight.
Suspend  the  radiator  via  the  screws  into 
the retainers. Ensure that the radiator does 
latch in.
Press on both cover caps and slide them to 
the rear.
Press the wall support clips onto both spacers.
Cover the radiator completely with the pro-
tective packaging. 

Electrical connection

Have the following activities carried out by 
an electrician (in accordance with the sepa-
rate instructions):

Connection of the electrical unit  
Connection  of  the  heating  element  to 
the electrical unit

Commissioning

Remove  the  protective  packaging  com-
pletely  before  final  cleaning  or  commis-
sioning. 



Summary of Contents for Ideos IDE10

Page 1: ...e du radiateur design Ideos IT Istruzioni d uso e di montaggio radiatore design Ideos RU Ideos CS N vod k pou it a mont i designov ho topn ho t lesa Ideos NL Gebruiks en montagehandleiding designradia...

Page 2: ...n Sie ausgediente Heizk rper mit Zu beh r dem Recycling oder der ordnungs gem en Entsorgung zu Beachten Sie die rtlichen Vorschriften Entsorgen Sie W rmetr gerfl ssigkeit ge m den beh rdlichen Bestimm...

Page 3: ...ires z B Handtuchstange montieren siehe separate Anleitung Obere Befestigungen montieren siehe Abb 6 9 Bohrpunkte anzeichnen siehe Abb A L cher bohren und D bel setzen An den Wandlagern die Sicherungs...

Page 4: ...at or as a climbing or mounting aid Safety precautions DANGER Danger to life Do not extinguish a fire with water Use a fire extinguisher with carbon diox ide foam powder or sand WARNING Risk of burns...

Page 5: ...f use Please note that electrical units may only be installed in certain areas in rooms with bath and shower facilities when choosing the in stallation site Observe the corresponding local regulations...

Page 6: ...r to align the radiator sideways Slide the retainers In order to set the wall clearance Pull out or push in the retainers In order to set the height Turn the adjust ing screw at the retainer Install t...

Page 7: ...antie restent valides Elimination Envoyer les radiateurs us s et leurs acces soires au recyclage ou un syst me d va cuation de d chets appropri Respectez les prescriptions locales Eliminez le fluide c...

Page 8: ...st me de chauffage avec r gulation via kit lectrique Montage D poser le radiateur avec l l ment chauffant mont de telle fa on que le c ble ne soit pas pli ni endommag Travaux pr paratoires voir ill 1...

Page 9: ...que Mise en service Enlever enti rement l emballage de pro tection pour le nettoyage final ou avant la mise en service IT Istruzioni d uso Uso consentito Il radiatore deve essere utilizzato solo per i...

Page 10: ...go Per la scelta del luogo di montaggio si ten ga presente che in ambienti adibiti a bagno o doccia gli apparecchi elettrici possono essere montati solo in determinate zone Rispettare la normativa loc...

Page 11: ...regolare la distanza dalla parete Far uscire o inserire di pi i supporti Per regolare l altezza Ruotare la vite di re gistro sul supporto Montare i distanziali inferiori e fissare il radia tore veder...

Page 12: ...12 RU 110 C 230 F 160115 RU BGV A3 31 25...

Page 13: ...13 31 50 7 8 1 5 230 16 A 6 9 A 10 11 49...

Page 14: ...h topn ho t lesa m e dos hnout teploty a 110 C 230 F P i dotyku topn ho t lesa proto bu te opatrn Topn t leso nesm b t v provozu je li p i pojovac kabel po kozen V p pad niku teplonosn kapaliny Zachy...

Page 15: ...m nky pou it P i v b ru m sta mont e m jte na pam ti e v prostorech vybaven ch za zen m do koupelen a sprch je mont elektrick ch p stroj povolena jen na ur it ch m stech Dodr ujte p slu n m stn p edpi...

Page 16: ...te pinky Pro nastaven odstupu od zdi Vyt hn te pinky nebo je zatla te dovnit Pro nastaven v ky Ot ejte se izovac m roubem na pince Namontujte spodn distan n dr ky a upev n te topn t leso viz obr 16 2...

Page 17: ...ewarmtetransportvloeistofafconform de wettelijke bepalingen via een erkend af valverwerkingsbedrijf afvalcode 160115 NL Montagehandleiding De radiator mag uitsluitend door een installa teur worden gem...

Page 18: ...sluitpunten Draai de lange bevestigingsschroeven in de bovenste moffen en draai ze vast Draai de korte bevestigingsschroeven in de onderste moffen en draai ze vast Monteer zonodig de bij levering inbe...

Page 19: ...r del calor Recoja el l quido en un recipiente Informe a su artesano especializado No sustituya nunca el l quido derramado por agua Limpieza Utilice nicamente detergentes suaves no abrasivos Reclamaci...

Page 20: ...Da os personales y materiales Comprobar la capacidad portante del sue lo Observar el peso del radiador ver p gi na 31 y las posibles cargas suplementarias Comprobar la idoneidad del material de fijaci...

Page 21: ...marca a la medida de 49 mm Montar los dos distanciadores en el radiador Colgar y alinear el radiador ver Fig 12 15 Colgar el radiador en los soportes mediante los tornillos Prestar atenci n al encaje...

Page 22: ...22 ZH 110 C 230 F 160115 ZH BGV A3 31 25 31 50 mm 7 8...

Page 23: ...23 1 5 230 V 16 A 6 9 A 10 11 49 mm 12 15 16 27...

Page 24: ...a Zu yte grzejniki wraz z akcesoriami nale y przeznaczy do recyklingu lub podda prze pisowej utylizacji Przestrzega miejscowych przepis w Ciek e medium grzewcze nale y utylizowa zgodnie z przepisami o...

Page 25: ...Tryb grzania elektrycznego niezale ny od systemu grzewczego z regu lacj poprzez zesp l regulacyjny Monta Grzejnik z zamontowan grza k ustawi tak aby kabel nie zosta zagi ty ani uszkodzony Czynno ci ws...

Page 26: ...r ci otwory i w o y kotwy Zdemontowa obydwie ramy dystansowe Dokr ci obydwa sworznie uchwytowe Zawiesi grzejnikprzez rubynawspornikach Zwr ci uwag aby grzejnik zacisn si Przycisn obydwie os onki i prz...

Page 27: ...27 160115 EL BGV A3 31 25 kg 31 50 mm 7 8 bar 1 5 230V 16 A...

Page 28: ...28 6 9 A 10 11 49 mm 12 15 16 27...

Page 29: ...29 mm 50 7 8 5 1 A 16 V 230 9 6 A 11 10 mm 49 15 12 26 16...

Page 30: ...30 FA FA F 230 C 110 160115 9 31 25 31...

Page 31: ...26 508 35 250 125 1342 17 6 1526 758 35 500 250 1342 26 0 1901 508 35 250 125 1717 21 9 1901 758 35 500 250 1717 32 3 R ckansicht View from the rear Vue arri re Vista posteriore Pohled zezadu Achteraa...

Page 32: ...32 x x 4 6 10 6 1 2 x x x 10 80 2 3 1 2 1 x 4 x 6 x 1 2 1 2 3 4 5 6 7 8 9...

Page 33: ...33 x 49 x 1 2 x x 4 x x 4 x x 2 1 2 10 11 12 13 14 15 16 17 18 19...

Page 34: ...34 6 60 1 2 x 15 x 2 1 x x x x 20 21 22 23 24 25 26...

Reviews: