
KEOFITT W9 USER MANUAL V.4
PAGE 32
10.MOUNTING INSTRUCTIONS
10.1 Location
The valve should always be located with its centre line in a horizontal position and with the two hose
pieces in a vertical position with the arrow pointing upwards as shown on the figure. Only with this
orientation the valve will be self draining.
IMPORTANT
• The tank-side of the valve body must be positioned flush with the inside of the tank or the pipe in
order to avoid any dead space.
10.2 Before welding
Remember to disassemble the valve body and head. The valve body and head must be separated during
welding. Rubber plugs, chain and membrane must be removed from the valve body, as otherwise heat
from the welding process will damage them.
Summary of Contents for W9
Page 1: ...DON T GAMBLE WITH YOUR SAMPLE W9 SAMPLING VALVE User Manual ...
Page 4: ...KEOFITT W9 USER MANUAL V 4 PAGE 4 ...
Page 44: ...KEOFITT W9 USER MANUAL V 4 PAGE 44 16 MEMBRANES 16 1 Silicone membrane art no 600051 ...
Page 45: ...KEOFITT W9 USER MANUAL V 4 PAGE 45 16 2 Silicone membrane for Micro Port art no 600251 ...
Page 46: ...KEOFITT W9 USER MANUAL V 4 PAGE 46 16 3 EPDM membrane art no 600052 ...
Page 47: ...KEOFITT W9 USER MANUAL V 4 PAGE 47 16 4 EPDM membrane for Micro Port art no 600252 ...
Page 48: ...KEOFITT W9 USER MANUAL V 4 PAGE 48 16 5 FFKM membrane art no 600053 ...
Page 49: ...KEOFITT W9 USER MANUAL V 4 PAGE 49 16 6 PTFE membrane art no 850055 ...