Installation
29
3.1.2 Horizontal
Installation
The horizontal installation is the recommended installation.
If the medium might contain solid particles, mount the meter as in position “A”, in all other cases as in position “B”.
Fix the meter to a solid, non-vibrating surface as close to the meter as possible. With the TCM0325 through
TCM3100 this could be done via the optional mounting threads.
If no non-vibrating surface is available, vibration dampers might be recommended.
Fig. 12: Recommended Horizontal Installation
3.1.3 Vertical
Installation
The diamond shaped TCM0325 through TCM3100 should not be mounted vertically at all.
All other meters can be mounted vertically. This would be the recommended position, if the medium might contain
gas bubbles and solid particles.
It is recommended to mount the meter in an upstream position for avoiding that it runs empty during operation.
Fix the meter to a solid, non-vibrating surface as close to the meter as possible.
If no non-vibrating surface is available, vibration dampers might be recommended.
Fig. 13: Vertical Installation
Summary of Contents for TRICOR TCE80 -E Series
Page 1: ...Certified according to DIN ISO 9001 Manual TRICOR Coriolis Mass Flow Meter ...
Page 2: ...SW Version Main V2 0x Display V2 0x Manual Revision 2 1 ...
Page 93: ...Listings 93 Fig 26 Dimensions TCE8000 E except A Fig 27 Dimensions TCE8000 E A ...
Page 98: ...Contact Copyright KEM Subject to change without notice ES Rev 002 23 01 2012 ...