Performance Veri
fi
cation
Performance Veri
fi
cation Procedures
Performance Veri
fi
cation
Conditions
The following conditions must be met before performing these procedures:
1.
The Device Under Test (DUT) and all test equipment must have been
operating continuously for 20 minutes in an environment that meets the
operating range speci
fi
cations for temperature and humidity.
Test setup changes affecting the remote sense require an additional 20 minute
warm-up period.
2.
The procedures are intended to be used in sequence. If it is necessary to
partially test the DUT using an individual test, a 20 minute warm-up period is
required for the individual test.
3.
You must connect the DUT and the test equipment to the same AC power
circuit. Connect the DUT and test instruments into a common power strip if
you are unsure of the AC power circuit distribution. Connecting the DUT and
test instruments into separate AC power circuits can result in offset voltages
between the equipment, which can invalidate this performance veri
fi
cation
procedure.
4.
The AC Power Source for the DUT must match the Voltage Selector switch
setting located on the bottom of the DUT.
DUT voltage selector
switch
AC source voltage
AC source voltage for
Japan products
110
115 V
100 V
220
230 V
200 V
Equipment Required
These procedures use external equipment to directly check warranted
characteristics. The following table lists the required equipment.
Series 2200 Multichannel Programmable DC Power Supplies Technical Reference
23