FLYWHEEL GUARD INSTALLATION
Step 1:
Make sure to have all parts and tools present prior to assembly (Fig. 34).
Step 2:
Assemble the brackets (B) to the tube (C) With the bolt and nut (A) finger tight (Fig. 35).
PARTS INVENTORY
A
Bolt and Nut
B
Brackets
C
Tube
Step 3:
Make sure the flywheel is centered in the middle of the 2x4 tube of the base frame.
Remove the two screws and washers from the base frame using 5mm Allen wrench. These
Screws will be used to mount the flywheel guard in (Fig. 36).
Step 4:
Place the assembled flywheel guard over the holes and hold the tube guard as shown, to the
left of the flywheel. Place the open end of the tube guard over the casting (Fig. 37).
Step 5:
Swing the tube over the flywheel, aligning the tube centered with the flywheel (Fig. 38).
Step 6:
Tighten the brackets to the base frame with the screws and washers that were removed
in step three. Do not fully tighten the bolts.
Step 7:
By not fully tightening the bolts, the brackets allow the tube to move left to right to some
degree. Center the tube with as much clearance as possible from the flywheel, then fully tighten
all the bolts using the 5mm Allen wrench and the two 10mm wrenches (Fig. 39). Make sure the
tube is centered over the flywheel in all directions.
A
B
C
34
35
36
37
10