CP 503/A, CP 505/A,D,K, CP 507/
A,C
Introduction
Project engineering manual V1.06
9
© KEBA 2021
1
Introduction
1.1
Purpose of the document
This document describes the structure of the CP 50x/x (CPU module).
Additionally, the installation and configuration is described enough to obtain
an operationally ready module. "Ready for operation" means that the assem-
bly is ready for the synchronization of the firmware and the application.
Information
The manual is written exclusively for the target groups listed in this manual.
The machine manufacturer or system supplier must incorporate the safety
information required for end customers into the operating manual for end
customers in the applicable national language.
1.2
Preconditions
This document contains information for persons with the following skills:
Target group
Knowledge and skills pre-requirement
Project engineer
Basic technical training (University of Applied Science/University
level, engineering degree or corresponding professional experience).
Knowledge in:
●
working mode of a PLC,
●
current valid safety regulations,
●
the application.
Electrician
Specialized training in the electro-technical field (in accordance with
industrial training guidelines).
Knowledge in:
●
current valid safety regulations,
●
wiring guidelines,
●
circuit diagrams,
●
system analysis and troubleshooting,
●
correct installation of electrical connections according to na-
tional and international regulations.
Start-up technician
Basic technical training (Vocational high school, engineering degree
or corresponding professional experience).
Knowledge in:
●
current valid safety regulations,
●
working mode of machine or plant,
●
principal functions of the application,
●
system analysis and troubleshooting,
●
setting options at the operating installations.