28
3.26
KaDeck
Versatile air conditioning for offices and administration buildings
Installation and operating instructions
6.5 Water connection with wet cooling
We recommend using Kampmann-side accessories to provide
the heat exchanger connections with the valves and on-site
pipework. Coordinate valves, hoses etc. to the available space
and requirements of the KaDeck.
Remove the condensation tray to connect up the water
connection. First check whether there is water in the tray or the
pipework. Dismantle the tray, as described under section 8.3.3.
First fit the flexible hose to the angle valve (including sealing
work) and then the angle valve to the KaDeck. Screw the
thermostat valve and the return shut-off valve using an
appropriate sealant (e.g. NEO Fermit) to the Eurokonus
connections on the convector. Now the actuator can be fitted
and the cable routed to the electrical connection area. Use the
clamps on the fan for this purpose.
Now fit the components for the return in the same order
and route the flexible connections to the required outlet
on the unit. Connect up the on-site water network and
insulate the pipes and flexible hoses as far as the valve. Use
vapour-impermeable insulation for this. Make sure that any
condensation that forms drips from the pipework and the
insulation into the condensation tray.
Check whether the hoses have been damaged or bent by the
work and are still in the fixing clamps before fitting the tray.
Insert the condensation tray into the fixings provided for this
purpose and check whether the tray is fitted horizontally.
Summary of Contents for KaDeck
Page 95: ......