4.9
Start Operation
4.9.1
Initializing sequence
NOTICE
Startup the machine without Material!
The material which are still in the machine must be removed before starting the
machine.
After switching and powering on the machine, the punch units, clamping units and the
pusher-carriage will be initialized by the control program. All axis will move to a fixed
cam, after reaching the fixed cam the axis get his reference point.
The control program asks for a confirmation of the correct performing
of the above-mentioned points. Confirmation is given by means of the
button "RESTART" on the operation desk.
Starting order of the initializing sequence:
-
Clamping units are opened
-
Shear unit and punching unit are controlled upwards
-
Flange punch unit initialised
-
Drilling unit initialised
-
Carriage initialised
-
Punching unit initialised
-
Marking unit initialised
-
Shear unit initialised
NOTICE
Correct performing of the initialising sequence must be checked
visually by the operator.
Summary of Contents for KPS Series
Page 1: ...MANUAL KPS 515 Serial No 2008 01 14564...
Page 2: ......
Page 6: ...KPS SERIES Contents M UK KPS 06 11 02 03 Page 6 of 138 KALTENBACH 7 Appendix 138...
Page 136: ......
Page 263: ......
Page 264: ......
Page 265: ......
Page 266: ......
Page 267: ......