Operating Instructions Powador-proLOG_EN
Page 45
9.5
List of code designations
Measured values
Powador-proLOG
Unit
Feed-in meter
E_Z_EVU
kWh
Counter for sub-system 1
E_Z_PV1
kWh
Counter for sub-system 2
E_Z_PV2
kWh
Counter for sub-system 3
E_Z_PV3
kWh
Irradiance in module level 0
G_M0
W/m
2
Irradiance in module level, part 1
G_M1
W/m
2
Irradiance in module level, part 2
G_M2
W/m
2
Irradiance in module level, part 3
G_M3
W/m
2
Irradiance in horizontal level
G_H0
W/m
2
Module temperature
T_M0
°C
Module temperature, part 1
T_M1
°C
Module temperature, part 2
T_M2
°C
Ambient temperature
T_U0
°C
Ambient temperature 1
T_U1
°C
Collector temperature
T_K0
°C
Collector temperature, part 1
T_K1
°C
Direct current
I_DC_0
A
Direct current of sub-system 1
I_DC_1
A
Direct current of sub-system 2
I_DC_2
A
Direct current of sub-system 3
I_DC_3
A
DC voltage
U_DC_0
V
DC voltage of sub-system 1
U_DC_1
V
DC voltage of sub-system 2
U_DC_2
V
DC voltage of sub-system 3
U_DC_3
V
Alternating current
I_AC_0
A
Alternating current of sub-system 1
I_AC_1
A
Alternating current of sub-system 2
I_AC_2
A
Alternating current of sub-system 3
I_AC_3
A
AC voltage
U_AC_0
V
AC voltage of sub-system 1
U_AC_1
V
AC voltage of sub-system 2
U_AC_2
V
AC voltage of sub-system 3
U_AC_3
V
Wind speed
W_V0
m/s
Wind direction
W_R0
°
Humidity
F_L0
%
Heat quantity of collector
WM_K0
kWh
Heat quantity of heating
WM_H0
kWh
Heat quantity of CHP
WM_BHKW0
kWh
S e c t i o n 9 ·
C o n f i g u r a t i o n E x a m p l e