No.
Item
Reference picture/drawing
Procedure
2-21
17
•
Sub cam
ª
Arm gear 2 assembly,
º
Clutch lock lever assembly
<Removal>
1) Remove the screw (S2) and take out the sub cam .
As L19 is engaged at the rear of the main deck
assembly while the phase is aligned, deviate the
phase in the direction of the arrow before removal.
20. This checking should be done after completing the
switching point adjustment.
Fig. 2-7-17(a)
Fig. 2-7-17(b) Removing the Clutch Lock Lever
Assembly
º
Fig. 2-7-17(c) Attaching the Sub Cam
•
Align the phases of the arm gear 2 assembly
ª
and clutch lock lever assembly
º
, attach them by
fitting the boss into the cam groove below, and
clamp with the screw.
31
(S2)
40
38
(L19)
39
40
Phase alignment
39
38
40
Phase
alignment
Phase
alignment
Phase
alignment
<Attaching>
1) Align the phase correctly by referring to Fig. 2-7-
17(c), then attach by reversing the removal proce-
dure.