2-5
Part Name
Ref.
Operating Hours (DRUM Hour Meter)
Symbol
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Tape transport parts
2
Gear cover assembly
8
Tension arm assembly
(
Guide rail (S)
assembly
*
Guide rail (T)
assembly
3
Middle catcher
assembly
q
Capstan shaft
5
Pinch roller arm
assembly
9
Exit guide arm
assembly
1
Drum
assembly
q
Capstan motor
fi
Reel drive pulley
assembly
e
R.drive gear 1
r
R.drive gear 2
›
Center gear
assembly
‹
Timing belt
6
Sub-brake
assembly
@
Main brake (S)
assembly
#
Main brake (T)
assembly
$
%
Reel disk
assemblies
7
Band arm plate
assembly
0
Swing arm
assembly
¤
Wheel gear-2
¢
Encoder gear
¶
Centering arm
assembly
∞
Min cam
•
Sub cam
t
Cleaner arm assembly
u
Cassette guide pin (Sub deck)
y
MIC contact (Sub deck)
Mechanism
assembly
(including cassette housing
assembly
)
FAN motor
M 8
46
M 8
40
M 8
22
M 8
23
M 8
24
M 8
4
M 8
44
M 8
43
M 8
50
M 8
4
M 8
33
M 8
47
M 8
48
M 8
34
M 8
11
M 8
36
M 8
38
M 8
37
M 8
39
M 8
41
M 8
42
M 8
3
M 8
21
M 8
26
M 8
8
M 8
9
M 8
43
M 8
35
M 8
35
M 8
1
M 2
43
2.7.14
2.7.8
2.7.12
2.7.12
2.7.5
2.7.3
2.7.4
2.7.2
2.7.15
2.7.15
2.7.15
2.7.14
2.7.14
2.7.10
2.7.10
2.7.10
2.7.11
2.7.8
2.7.7
2.7.2
2.7.18
2.7.18
2.7.18
2.7.19
2.7.4
: Clean with ethanol.
: Check and replace if required.
: Replace.
>
: Oil the shaft.
After replacing a part, apply lubricant to the required points.
500
>
>
>
>
1000
>
>
>
>
3000
>
>
>
>
5000
1500
3500
4500
5500
6000
>
>
>
>
>
2000
>
>
>
>
>
4000
2500
2.4.2
Maintenance and inspection list
1) The 6000 H maintenance consists of a replacement of the entire mechanism assembly.
2) When mounting the capstan motor on the main deck, control of the verticality is required. Therefore, when the capstan motor
reaches the end of its service life, the entire mechanism assembly should be replaced.
Table 2-4-1