Installa
tion
Page 27
© JVA Technologies. www.jva-fence.com
9
INSTALLATION
9.1 INSTALLATION STEPS
1. Ensure that you have read through this manual first!
2. Design and build the fence. (Beyond the scope of this guide)
3. Decide where the JMB energizer is to be mounted. If on an external
wall it should be housed within an equipment box and not in direct
sunlight.
4. Remove the 4 plastic bolts that tighten the lid of the enclosure
5. Use the provided concrete screws. The mounting holes are below the 4
large plastic lid bolts. Screw the enclosure to mounting wall.
6. Wire the low voltage cables to the PCB terminals passing through the
small cable glands.
7. Wire the fence and earth cables to the fence terminals passing through
the large cable glands.
8. The
unused black glands
should be sealed with a short length of round
cable, to prevent insects from making their way inside.
9. Fit the battery leads to the battery through the small cable glands.
10. The Error LED should be blinking twice to show mains fail.
11. The Energizer is designed not to start when first powered up irrespec
-
tive of the state of the Control Inputs.
12. Attach the Lid using the 4 plastic bolts.
13. Turn AC power onto the 24Vdc power pack.
14. Arm the JMB using the switch on the right side of the enclosure or by
using the Virtual Keypad (refer to the Virtual Keypad section).
15. The Virtual Keypad or a connected Keypad will now show the fence
voltage(s) and current(s).
16. Lastly, find and remove any faults on the fence.