background image

It  rotates  counterclockwise

It  rotates  clockwise

It  is  recommended  that  the  maximum  temperature  not  

be  set  above  60ÿC.

It  rotates  counterclockwise

The  central  heating  is  thus  switched  off.  Domestic  hot  water  supply,  

heat  regulation  and  voltage  supply  for  the  timer  clock  are  maintained.

The  domestic  hot  water  flow  is  approx.  10  l /  min.

B  Temperatures  up  to  70ÿC  will  only  be  set  for  a  short  

time  (thermal  disinfection).

Fig.  29  

Tab.  7  

Whenever  the  boiler  is  started  in  position  I,  the  pump  is  activated  

every  24  hours  for  approx.  1  minute1,  to  avoid  blocking  it.

risk  of  scalding!

B  Set  the  cylinder  temperature  using  the  boiler  temperature  

controller.

approx.  10  ÿC  (frost  

protection).

pray

On  ZW  models,  the  domestic  hot  water  temperature  can  be  adjusted  

from  the  temperature  controller  between  40ÿC  and  60ÿC  (29).

OK).  

approx.  40  °  C

Water  temperature

Tab.  8  

The  digital  display  indicating  "Su" (summer)  flashes  for  approx.  

3  seconds.

Setting  the  controller

approx.  60  °  C

Setting  the  controller

approx.  70  ÿC

B  The  temperature  for  the  normal  operating  mode  

will  not  be  set  above  60ÿC.

B  Turn  the  temperature  control  on  the  boiler  counterclockwise  until  it  

stops.

This  plant  has  a  system  for  diagnosing  faults.  A  fault  is  

indicated  by  an  LED  and  an  error  code  on  the  digital  display.  The  boiler  

will  return  to  normal  operation  after  the  fault  has  been  rectified  and  after  

it  has  been  switched  off

Putting  into  service

pray

B  Check  the  chapter  in  this  manual  for  troubleshooting  9.

The  hot  water  temperature  is  indicated  on  the  cylinder.

It  rotates  clockwise

The  digital  display  indicates  the  selected  temperature.  The  display  

flashes  until  the  desired  value  is  obtained.

23  

emergency  key.

Warning:

Cylinders  with  NTC  sensor

Water  temperature

B  Do  not  switch  off  the  boiler  (gas  and  water  connections

6  720  608  487  

6.7  Summer  operation  mode  (domestic  

hot  water  preparation  only)

6.8  Frost  protection

6.6  Domestic  hot  water  flow  and  

temperature  (ZW  models ..)

6.5  Adjusting  the  temperature  of  the  hot  

water  boiler  (ZS  models ..)

6.9  Protection  against  pump  blockage

6.10  Diagnosing  faults

1.  After  the  last  service

Machine Translated by Google

Summary of Contents for Ceraclass midi ZS 24-2 DH AE 23

Page 1: ...ZW 24 2 DH AE 23 ZW 24 2 DH AE 31 ZS 24 2 DH AE 23 ZS 24 2 DH AE 31 Junkers Ceraclass midi Installation and operation manual Machine Translated by Google...

Page 2: ...valve test 8 7 4 2 Volumetric adjustment method 27 Installing the accessory drawer Safety instructions Checking the links Hot water boiler temperature control ZS models 23 Domestic water heating 31 17...

Page 3: ...original spare parts will be used B Do not use or store flammable materials he is not allowed to make modifications or repair the installation himself B The boiler switches off B The windows open Be c...

Page 4: ...and vice versa Gas family type Mounting kit gaskets ZW 24 LCD screen with temperature reading display TR 15 RF with weekly programming ZS 24 EEC 89 336 EEC and corresponds to the approval sample descr...

Page 5: ...36 The face 88 Wall mounting bracket Control panel 90 2 6 Dimensions 6 720 608 487 Power plant information Fig 1 5 FIG 2 Top view Machine Translated by Google...

Page 6: ...Burner 6 19 MAX gas adjusting screw Ventilator 5 3 way motorized valve 2 62 Circulation pump with automatic aerator 70 Nitrogen loading valve Air intake duct 73 Static heat exchanger 59 66 72 Automat...

Page 7: ...nozzle 75 Flow limiter 2 68 Temperature limiter Heating system return Ionization electrode 19 Nozzle Expansion tank 79 Manometer 59 65 MAX gas adjusting screw 3 way valve motor 74 Differential pressur...

Page 8: ...will take place automatically If this also fails a safety stop follows Direct extraction ZW 2 10 3 Pump 8 flames An ionization electrode 3 takes over the monitoring B Press the emergency key The burne...

Page 9: ...etermined according to the preload pressure in the expansion vessel B Open the nitrogen filling valve 70 and lower the preload pressure to 0 5 bar The boiler is in operation and the room temperature i...

Page 10: ...Nominal water flow at T 20 C 18 kW 1 8 10 Central heating system 53 Flue gas values l min Maximum power consumption unity Maximum pressure bar C 11 9 26 5 kW 0 75 Natural gas H Domestic hot water ZW...

Page 11: ...ted according to 33 kg unity Weight no packaging 0 35 Dimensions H x W x H Power absorbed IP l min X4D 11 50 Hz bar 230 Electrical voltage 11 8 700 x 400 x 298 Protection type Overview ZS ZW 24 DH AE...

Page 12: ...gulations for the design and execution of liquefied petroleum gas LPG supply systems I 31 Norm for the operation of natural gas supply systems I 6 1 98 Instantaneous hot water generators Normative for...

Page 13: ...on air must be free of hazardous substances Halogenated acids containing chlorine or fluorine bonds are considered to be corrosion promoting substances If it is not possible to meet these conditions a...

Page 14: ...ding the minimum distances specified in Fig 7 B Remove the package and follow the instructions on the package B Attach the wall bracket to the appropriate position in the room see section 4 3 B Mark t...

Page 15: ...ard B To remove the control panel completely when it is positioned as in Fig 10 get up and pull forward For electrical safety reasons the jacket and control panel are secured against unauthorized remo...

Page 16: ...1 4 B Install the diameter diaphragm 2 in diameter Warning Rolling diaphragm to be 7 5 NG B Check all gaskets for proper positioning finally tighten the Dutch pipe connection nuts B To install the ac...

Page 17: ...r check pressure per manometer B Switch on the boiler and check the circuit pressure initial Pressure leaks may occur during boiler installation In such cases repeat the filling process until the pres...

Page 18: ...ns interventions on the electrical part fuses switch B Insert the plug of the power cord into a grounded outlet always disconnected before The electrical connection must comply with the rules in force...

Page 19: ...the room thermostat TR 12 TRZ Fig 21 TRZ 12 2 12 2 Electrical connections 19 Fig 22 TR 15 RF Room thermostat Fig 20 TR 12 B Remove the jumper between terminals 1 4 Fig 19 item 83 Fig 23 EU 9 D Machin...

Page 20: ...the Junkers service technicians for the kit Indirectly heated boiler with NTC sensor boiler flexible tubing Connecting cable with adaptation required The kit consists of an NTC sensor with a cable and...

Page 21: ...and on the other hand provide the customer with all the necessary information installs a softening system or 21 Putting into service B On ZW models the shut off valve opens Fig 25 51 Manometer Heatin...

Page 22: ...ometer shows the flow temperature heating fill the heating system again so that a pressure of 1 2 bar is obtained frost free position if the thermostat is in this position a primary circuit temperatur...

Page 23: ...ing the controller approx 70 C B The temperature for the normal operating mode will not be set above 60 C B Turn the temperature control on the boiler counterclockwise until it stops This plant has a...

Page 24: ...al gas for at least 2 seconds to save the settings made The LED and display flash Other adjustments can be made in service mode It is recommended to adjust according to the method of adjusting the pre...

Page 25: ...boiler for maximum nozzle pressure At a supply pressure between 15 mbar and 18 mbar for natural gas the rated power must be set to 85 MIN at twelve mbar 1 74 B Turn the temperature knob The digital d...

Page 26: ...or the minimum heating power see Tab 11 74 Gas supply pressure control Propane 2 1 kg h Bhutan1 Propane1 B The service mode is activated see chapter 7 2 flashing and connect the manometer with a U sha...

Page 27: ...a flashing light and the indication The control system will adjust the boiler to the maximum heating power l min completely in mbar 32 35 B Turn the temperature knob necessary 16 18 8 Heating power kW...

Page 28: ...to exit service mode 1 4 B Remove the protective cover by releasing the four 12 B Turn the temperature knob B Pass the modified gas type on the nameplate 1 1 l min B Remove the burner 42 7 GPL 28 74 2...

Page 29: ...el and if necessary fill it with an air pump at approx 0 75 bar B Gaskets and sealing rings will be removed always disconnected before the heat B The power supply to the boiler will be spare parts saf...

Page 30: ...t B Tighten all joints again with screwing Reading B Check for gas leaks Reading Last 8 failures B The service gas valve is closed Fig 35 13 Digital display test Once the parameter number has been sel...

Page 31: ...until obtained on the display 01 there is water flow B Turn the thermostat to 10 8 4 5 Temperature selected for flow 8 4 8 Differential pressure switch until obtained on the display No summer mode of...

Page 32: ...e burner is still running it is not possible to perform the test and the display shows Depending on the position of the thermostat instruction 17 B Turn the thermostat on 8 4 18 Pump test 02 terrestri...

Page 33: ...rcuit Checking the status of the limiter No ionization current occurs Check the connections to the pressure switch Ventilate the system and open the automatic boiler aerator displays Gas valve failure...

Page 34: ...switch connections are Insufficient water flow for Check connections Solution limestone Excess temperature in the primary circuit 34 Possible cause Check that the combustion chamber and or heat exchan...

Page 35: ...6 720 608 487 35 Machine Translated by Google...

Page 36: ...Thermotechnical Department Str Horia Macelariu Nr 30 34 www bosch romania ro 013937 Bucharest S C Robert Bosch S R L Machine Translated by Google...

Reviews: