background image

2.11  Expansion  vessel

Knight  I

Speed  II

Speed  III

6  720  608  487  

Power  plant  information

FIG.  6  Pump  characteristic

Tab.  4  

150  143  135  127  119  111  

1,0  

0,5  0,6  0,7  0,8  0,9  

Maximum  
pressure  

(bar)

Water  
capacity  (I)

RF)  

9  

ambient  (TRZ12-2 /  TR15RF).

•  It  is  in  the  programming  range  (TRZ12-2 /  TR15

At  a  flow  temperature  of  88  ÿC,  the  maximum  water  volume  of  

the  system  can  be  determined  according  to  the  preload  

pressure  in  the  expansion  vessel.

B  Open  the  nitrogen  filling  valve  (70)  and  lower  the  preload  

pressure  to  0.5  bar.

•  The  boiler  is  in  operation  and  the  room  temperature  is  lower  

than  that  set  in  the  thermostat

The  boiler  has  an  expansion  vessel  with  a  capacity  

of  6  l  and  a  preload  pressure  of  0.75  bar  to  compensate  for  

pressure  rises  due  to  the  temperature  rise  of  the  heating  

medium  during  operation.

To  increase  capacity:

•  The  room  temperature  is  lower  than  that  set  in  the  room  

thermostat  (TR12).

Machine Translated by Google

Summary of Contents for Ceraclass midi ZS 24-2 DH AE 23

Page 1: ...ZW 24 2 DH AE 23 ZW 24 2 DH AE 31 ZS 24 2 DH AE 23 ZS 24 2 DH AE 31 Junkers Ceraclass midi Installation and operation manual Machine Translated by Google...

Page 2: ...valve test 8 7 4 2 Volumetric adjustment method 27 Installing the accessory drawer Safety instructions Checking the links Hot water boiler temperature control ZS models 23 Domestic water heating 31 17...

Page 3: ...original spare parts will be used B Do not use or store flammable materials he is not allowed to make modifications or repair the installation himself B The boiler switches off B The windows open Be c...

Page 4: ...and vice versa Gas family type Mounting kit gaskets ZW 24 LCD screen with temperature reading display TR 15 RF with weekly programming ZS 24 EEC 89 336 EEC and corresponds to the approval sample descr...

Page 5: ...36 The face 88 Wall mounting bracket Control panel 90 2 6 Dimensions 6 720 608 487 Power plant information Fig 1 5 FIG 2 Top view Machine Translated by Google...

Page 6: ...Burner 6 19 MAX gas adjusting screw Ventilator 5 3 way motorized valve 2 62 Circulation pump with automatic aerator 70 Nitrogen loading valve Air intake duct 73 Static heat exchanger 59 66 72 Automat...

Page 7: ...nozzle 75 Flow limiter 2 68 Temperature limiter Heating system return Ionization electrode 19 Nozzle Expansion tank 79 Manometer 59 65 MAX gas adjusting screw 3 way valve motor 74 Differential pressur...

Page 8: ...will take place automatically If this also fails a safety stop follows Direct extraction ZW 2 10 3 Pump 8 flames An ionization electrode 3 takes over the monitoring B Press the emergency key The burne...

Page 9: ...etermined according to the preload pressure in the expansion vessel B Open the nitrogen filling valve 70 and lower the preload pressure to 0 5 bar The boiler is in operation and the room temperature i...

Page 10: ...Nominal water flow at T 20 C 18 kW 1 8 10 Central heating system 53 Flue gas values l min Maximum power consumption unity Maximum pressure bar C 11 9 26 5 kW 0 75 Natural gas H Domestic hot water ZW...

Page 11: ...ted according to 33 kg unity Weight no packaging 0 35 Dimensions H x W x H Power absorbed IP l min X4D 11 50 Hz bar 230 Electrical voltage 11 8 700 x 400 x 298 Protection type Overview ZS ZW 24 DH AE...

Page 12: ...gulations for the design and execution of liquefied petroleum gas LPG supply systems I 31 Norm for the operation of natural gas supply systems I 6 1 98 Instantaneous hot water generators Normative for...

Page 13: ...on air must be free of hazardous substances Halogenated acids containing chlorine or fluorine bonds are considered to be corrosion promoting substances If it is not possible to meet these conditions a...

Page 14: ...ding the minimum distances specified in Fig 7 B Remove the package and follow the instructions on the package B Attach the wall bracket to the appropriate position in the room see section 4 3 B Mark t...

Page 15: ...ard B To remove the control panel completely when it is positioned as in Fig 10 get up and pull forward For electrical safety reasons the jacket and control panel are secured against unauthorized remo...

Page 16: ...1 4 B Install the diameter diaphragm 2 in diameter Warning Rolling diaphragm to be 7 5 NG B Check all gaskets for proper positioning finally tighten the Dutch pipe connection nuts B To install the ac...

Page 17: ...r check pressure per manometer B Switch on the boiler and check the circuit pressure initial Pressure leaks may occur during boiler installation In such cases repeat the filling process until the pres...

Page 18: ...ns interventions on the electrical part fuses switch B Insert the plug of the power cord into a grounded outlet always disconnected before The electrical connection must comply with the rules in force...

Page 19: ...the room thermostat TR 12 TRZ Fig 21 TRZ 12 2 12 2 Electrical connections 19 Fig 22 TR 15 RF Room thermostat Fig 20 TR 12 B Remove the jumper between terminals 1 4 Fig 19 item 83 Fig 23 EU 9 D Machin...

Page 20: ...the Junkers service technicians for the kit Indirectly heated boiler with NTC sensor boiler flexible tubing Connecting cable with adaptation required The kit consists of an NTC sensor with a cable and...

Page 21: ...and on the other hand provide the customer with all the necessary information installs a softening system or 21 Putting into service B On ZW models the shut off valve opens Fig 25 51 Manometer Heatin...

Page 22: ...ometer shows the flow temperature heating fill the heating system again so that a pressure of 1 2 bar is obtained frost free position if the thermostat is in this position a primary circuit temperatur...

Page 23: ...ing the controller approx 70 C B The temperature for the normal operating mode will not be set above 60 C B Turn the temperature control on the boiler counterclockwise until it stops This plant has a...

Page 24: ...al gas for at least 2 seconds to save the settings made The LED and display flash Other adjustments can be made in service mode It is recommended to adjust according to the method of adjusting the pre...

Page 25: ...boiler for maximum nozzle pressure At a supply pressure between 15 mbar and 18 mbar for natural gas the rated power must be set to 85 MIN at twelve mbar 1 74 B Turn the temperature knob The digital d...

Page 26: ...or the minimum heating power see Tab 11 74 Gas supply pressure control Propane 2 1 kg h Bhutan1 Propane1 B The service mode is activated see chapter 7 2 flashing and connect the manometer with a U sha...

Page 27: ...a flashing light and the indication The control system will adjust the boiler to the maximum heating power l min completely in mbar 32 35 B Turn the temperature knob necessary 16 18 8 Heating power kW...

Page 28: ...to exit service mode 1 4 B Remove the protective cover by releasing the four 12 B Turn the temperature knob B Pass the modified gas type on the nameplate 1 1 l min B Remove the burner 42 7 GPL 28 74 2...

Page 29: ...el and if necessary fill it with an air pump at approx 0 75 bar B Gaskets and sealing rings will be removed always disconnected before the heat B The power supply to the boiler will be spare parts saf...

Page 30: ...t B Tighten all joints again with screwing Reading B Check for gas leaks Reading Last 8 failures B The service gas valve is closed Fig 35 13 Digital display test Once the parameter number has been sel...

Page 31: ...until obtained on the display 01 there is water flow B Turn the thermostat to 10 8 4 5 Temperature selected for flow 8 4 8 Differential pressure switch until obtained on the display No summer mode of...

Page 32: ...e burner is still running it is not possible to perform the test and the display shows Depending on the position of the thermostat instruction 17 B Turn the thermostat on 8 4 18 Pump test 02 terrestri...

Page 33: ...rcuit Checking the status of the limiter No ionization current occurs Check the connections to the pressure switch Ventilate the system and open the automatic boiler aerator displays Gas valve failure...

Page 34: ...switch connections are Insufficient water flow for Check connections Solution limestone Excess temperature in the primary circuit 34 Possible cause Check that the combustion chamber and or heat exchan...

Page 35: ...6 720 608 487 35 Machine Translated by Google...

Page 36: ...Thermotechnical Department Str Horia Macelariu Nr 30 34 www bosch romania ro 013937 Bucharest S C Robert Bosch S R L Machine Translated by Google...

Reviews: