MX10004 Site Preparation Checklist
summarizes the tasks you must perform to prepare a site for the
MX10004 router.
Table 28: MX10004 Site Preparation Checklist
✓
Item or Task
For More Information
Environment
□
Verify that environmental factors such as temperature
and humidity are within router tolerances.
See
"MX10004 Environmental Requirements
and Specifications" on page 81
.
Power
□
Measure the distance between external power sources
and the router installation site.
□
Calculate the power consumption and requirements.
See
"MX10004 Power Planning" on page 88
.
Rack
□
Verify that your rack meets the minimum requirements
for router installation.
See
"MX10004 Rack Requirements" on page
.
□
Plan rack location, including required space clearances for
optimal airflow.
See
"MX10004 Clearance Requirements for
Airflow and Hardware Maintenance" on page
87
.
□
Secure the rack to the floor and the building structure.
Cables
80