11
.1
4
E
N
146
5.3
Servicing PzV and PzV-BS lead-acid batteries with sealed armour
plated cells
Z
Do not add water!
5.3.1 Daily
– Charge the battery after each discharge.
5.3.2 Weekly
– Visually inspect for dirt and physical damage.
5.3.3 Every three months
– Measure and record the overall voltage.
– Measure and record the individual voltages.
– Compare the results with the previous ones.
Z
Carry out the measurements after full charging and subsequent resting for at least
5 hours.
Z
If you find significant differences compared with the previous measurements or
differences between the cells, contact the manufacturer's customer service
department.
5.3.4 Annually
– Measure the truck insulation resistance in accordance with EN 1175-1.
– Measure the battery insulation resistance in accordance with EN 1987-1.
Z
In accordance with DIN EN 50272-3 the battery insulation resistance should not be
less than 50
ȍ
per volt of rated voltage.
Summary of Contents for ESC 316
Page 1: ...06 13 11 14 51314819 ESC 316 316z Operating instructions G ESC 316z ESC 316 ...
Page 3: ...11 14 EN 2 ...
Page 9: ...11 14 EN 8 ...
Page 13: ...11 14 EN 12 ...
Page 22: ...21 11 14 EN b11 b5 b2 x Wa e a 2 Ast a 2 h13 h2 h3 h1 h4 l2 y l1 l c m2 s 187 1278 h6 Q ...
Page 46: ...45 11 14 EN 2 Displays and Controls 7 12 53 54 55 6 56 13 16 15 57 58 59 20 ...
Page 103: ...11 14 EN 102 ...
Page 157: ......