63
03
.0
9 EN
5
Emergency lowering
Mast emergency lowering
CAUTION!
Risk of injury from the mast
X
Instruct other people to vacate the hazardous area during emergency lowering.
X
Only start the truck when the error has been rectified.
Requirements
– Required tools and materials
– 3 mm diameter pin, tool etc.
Procedure
• Remove the front panel.
• Using a suitable object (pen, tool or similar), push in and hold down on the emer-
gency lowering valve (41) .
ZZ mast emergency lowering valve
E mast emergency lowering valve
The mast is now lowered.
41
63
03
.0
9 EN
5
Emergency lowering
Mast emergency lowering
CAUTION!
Risk of injury from the mast
X
Instruct other people to vacate the hazardous area during emergency lowering.
X
Only start the truck when the error has been rectified.
Requirements
– Required tools and materials
– 3 mm diameter pin, tool etc.
Procedure
• Remove the front panel.
• Using a suitable object (pen, tool or similar), push in and hold down on the emer-
gency lowering valve (41) .
ZZ mast emergency lowering valve
E mast emergency lowering valve
The mast is now lowered.
41
Summary of Contents for EKS 110
Page 1: ...03 09 03 09 51141993 EKS 110 Operating instructions G...
Page 7: ...03 09 DE 6...
Page 9: ...0506 GB 2...
Page 11: ...03 09 EN 8...
Page 33: ...03 09 EN 30...
Page 77: ...03 09 EN 74...
Page 121: ...0506 GB 18...