4.12.2
Operating the lift mechanism with the Multi Pilot
Lifting and lowering
Requirements
– To prepare the truck for operation, see
Procedure
• Pull the Multi-Pilot (126) in direction H to raise
the load.
• Push the Multi Pilot (126) in direction S to
lower the load.
The load is now raised / lowered.
H
S
126
Z
When the limit position for the operation has been reached (there will be a noise
from the pressure relief valve) release the lever. The lever will revert automatically to
neutral.
Tilting the mast forward / backward
Requirements
– Truck prepared for operation, see page 86.
Procedure
• Push the Multi-Pilot lever (126) in direction V
to tilt the mast forward.
• Push the Multi-Pilot lever (126) in direction R
to tilt the mast back.
The mast is now tilted back / forward.
V
R
126
Z
When the limit position for the operation has been reached (there will be a noise
from the pressure relief valve) release the lever. The lever will revert automatically to
neutral.
105
10.20 en-GB
Summary of Contents for EFG 110
Page 2: ...2 ...
Page 4: ...4 10 20 en GB ...
Page 10: ...10 10 20 en GB ...
Page 23: ...Ast a 2 e a 2 W a c Q h 6 h 7 H 1 h 1 h 3 h 4 h 2 m 1 b L2 L1 y m 2 h 10 x 23 10 20 en GB ...
Page 38: ...38 10 20 en GB ...
Page 46: ...46 10 20 en GB ...
Page 56: ...The battery is now charged 56 10 20 en GB ...
Page 58: ...58 10 20 en GB ...
Page 63: ...72 71 73 69 74 75 70 69 68 67 66 64 65 63 63 10 20 en GB ...
Page 65: ...80 77 76 79 72 71 65 10 20 en GB ...
Page 172: ...172 10 20 en GB ...