E 9
0406
.GB
4.3
Lifting and depositing loads
M
Before collecting a load, the driver must
ensure that it is correctly palletised and
that the capacity of the truck is not
exceeded. It is forbidden to collect long
loads at an angle.
– Fully insert the truck and the load
handler underneath the load.
Z
The operator platform must be occupied
by the operator to release lifting/
lowering.
Z
The lifting and lowering speeds are
preset.
Lifting
– Press the “Lift” (8) button until you reach the desired lift height.
M
When you reach the limit position of the load handler, immediately release the button.
Lowering
– Press the “Lower” button (7).
7
8
7
8
E 9
0406
.GB
4.3
Lifting and depositing loads
M
Before collecting a load, the driver must
ensure that it is correctly palletised and
that the capacity of the truck is not
exceeded. It is forbidden to collect long
loads at an angle.
– Fully insert the truck and the load
handler underneath the load.
Z
The operator platform must be occupied
by the operator to release lifting/
lowering.
Z
The lifting and lowering speeds are
preset.
Lifting
– Press the “Lift” (8) button until you reach the desired lift height.
M
When you reach the limit position of the load handler, immediately release the button.
Lowering
– Press the “Lower” button (7).
7
8
7
8
Summary of Contents for ECE 118
Page 1: ...Operating instructions 51092878 ECE 118 G 08 06 07 08...
Page 3: ...0108 GB 0108 GB...
Page 7: ...0506 GB 2 0506 GB 2...
Page 9: ...0406 GB A 2 0406 GB A 2...
Page 13: ...0708 GB B 4 Dimensions b1 1006 850 0708 GB B 4 Dimensions b1 1006 850...
Page 17: ...0708 GB B 8 0708 GB B 8...
Page 27: ...0406 GB D 6 0406 GB D 6...
Page 34: ...E 7 0406 GB B R V 13 4 R V 0 3 5 B B B F 14 E 7 0406 GB B R V 13 4 R V 0 3 5 B B B F 14...
Page 51: ...0406 GB E 24 0406 GB E 24...
Page 81: ...0506 GB 18 0506 GB 18...